Mt Arthur Coal
Annual Review FY23
29 September 2023
ANNUAL REVIEW FY23 | |||
Table of Contents | |||
2 | Introduction | 10 | |
3 | Approvals | 13 | |
4 | Operations Summary | 14 | |
4.1 | Mining Operations | 14 | |
4.2 | Other Operations | 14 | |
4.3 | Employment Details | 15 | |
4.4 | Next Reporting Period | 15 | |
5 | Actions Required from Previous Annual Review | 16 | |
6 | Environmental Performance | 17 | |
6.1 | Noise | 17 | |
6.2 | Blasting | 21 | |
6.3 | Meteorological Data | 22 | |
6.4 | Air Quality | 23 | |
6.5 | Biodiversity | 27 | |
6.6 | Visual Amenity and Lighting | 40 | |
6.7 | Aboriginal Cultural Heritage | 41 | |
6.8 | European Cultural Heritage | 42 | |
6.9 | Contaminated Land and Hydrocarbon Contamination | 43 | |
6.10 | Spontaneous Combustion | 44 | |
6.11 | Bushfire | 45 | |
6.12 | Greenhouse Gas and Energy | 45 | |
6.13 | Waste Management | 46 | |
6.14 | Public Safety | 47 | |
7 | Water Management | 47 | |
7.1 | Water Balance | 48 | |
7.2 | Erosion and Sediment | 49 | |
7.3 | Surface Water | 52 | |
7.4 | Ground Water | 56 | |
8 | Rehabilitation | 62 | |
Page 2 of 128 |
ANNUAL REVIEW FY23 | |||
8.1 | Buildings and Infrastructure | 62 | |
8.2 | Topsoil | 62 | |
8.3 | Landform Design | 63 | |
8.4 | Other Activities | 67 | |
8.3 | Rehabilitation Activities for Next Reporting Period | 74 | |
9 | Community | 75 | |
9.1 | Community Engagement | 75 | |
9.2 | Community Investment | 77 | |
10 | Independent Audit | 78 | |
11 | Incidents and Non-compliances | 102 | |
12 Activities during Next Reporting Period | 105 | ||
Appendix 1 - Surface Water Quality Monitoring Results | 107 | ||
Appendix 2 Ground Water Monitoring Results and Groundwater Level Drawdown Analysis | 110 | ||
Appendix 3 Community Complaints | 111 | ||
Appendix 4 Annual Coal Transport Report FY23 | 118 | ||
Appendix 5 Rehabilitation Plan & and Monitoring Results | 126 | ||
Appendix 6 Baiting & Weed Management Reports | 127 | ||
List of Figures | |||
Figure 1: Mt Arthur Coal mining leases, approved disturbance boundary and offset areas | 11 | ||
Figure 2: Mt Arthur Coal locality plan | 12 | ||
Figure 3: Air quality, blasting, noise and meteorological monitoring locations | 20 | ||
Figure 4: Waste disposal from Mt Arthur Coal FY23 | 46 | ||
Figure 5 Riparian Vegetation and Channel Stability Monitoring Locations | 51 | ||
Figure 6: Groundwater and surface water monitoring locations | 54 | ||
Figure 7: Topsoil spreading at OPD emplacement | 64 | ||
Figure 8 Bulk shaping and topsoil spreading at the Saddlers North emplacement | 65 | ||
Figure 9 Rehabilitation Area Nomenclature | 70 | ||
Figure 10 Relocated Tiger Orchid (Cymbidium canaliculatum) | 71 | ||
Figure 11: Comparison of complaints received during current and previous financial years | 76 |
Page 3 of 128
ANNUAL REVIEW FY23 | |
List of Tables | |
Table 4: Mt Arthur Coal management contact details | 10 |
Table 5: Mt Arthur Coal's existing statutory approvals as at 30 June 2023 | 13 |
Table 6: Production summary | 14 |
Table 7: Actions required from FY22 Annual Review and additional requirements for FY23 Annual Review | 16 |
Table 8: Monthly attended night-time noise monitoring results in decibels | 17 |
Table 9: Attended noise monitoring results in decibels in comparison to previous years | 18 |
Table 10: Summary of blast monitoring results | 22 |
Table 11: Comparison of annual average deposited dust results | 23 |
Table 12: Summary of TEOM PM10 monitoring results using validated data | 25 |
Table 13: 24-hour PM10 exceedances and calculated Mt Arthur Coal incremental impact for statutory TEOMs | 26 |
Table 14: Summary of total suspended particulate results | 26 |
Table 15 FY23 rehabilitation monitoring sites | 28 |
Table 16: Summary of native and introduced flora species within 20 x 20 m plots and condition scores across FY23 | |
rehabilitation sites | 29 |
Table 17 MS1: Comparison between reference site and benchmark values | 30 |
Table 18 MS1 assessment against phase and domain specific criteria | 30 |
Table 19 MS1 data comparison to draft completion criteria | 31 |
Table 20 VB6: Comparison between historic data, reference site and benchmark values | 32 |
Table 21 VB6 data comparison to draft completion criteria | 32 |
Table 22 VB6 assessment against phase and domain specific criteria | 32 |
Table 23 VB4: Comparison between historic data, reference site and benchmark values | 34 |
Table 24 VB4 data comparison to draft completion criteria | 34 |
Table 25 VB4 assessment against phase and domain specific criteria | 35 |
Table 26 VB5: Comparison between historic data, reference site and benchmark values | 37 |
Table 27 VB5 data comparison to draft completion criteria | 37 |
Table 28 VB5 assessment against phase and domain specific criteria | 37 |
Page 4 of 128 |
ANNUAL REVIEW FY23 | |
Table 29 Pest animal control program results for FY23 | 40 |
Table 30: Summary of spontaneous combustion at Mt Arthur Coal in FY23 | 44 |
Table 31: Water take for FY23 | 48 |
Table 32: Riparian vegetation assessment - FY23 RARC and CSIRO Assessment Results | 50 |
Table 33: Summary of statutory surface water quality monitoring results | 55 |
Table 34: Groundwater Level Trigger Exceedances | 57 |
Table 35: Groundwater Quality Trigger Exceedances | 60 |
Table 36 Topsoil stockpiles maintained in the reporting period | 62 |
Table 37 Mt Arthur Coal pasture seed mix | 65 |
Table 38: Mt Arthur Coal rehabilitation claimed for FY22 | 66 |
Table 39: Mt Arthur Coal rehabilitation summary | 66 |
Table 40 Diversity Tube stock mix used in McDonalds South | 67 |
Table 41 Diversity ground cover seed mix used in MacDonalds South | 68 |
Table 42 Box Gum Woodland Mix used in MacDonalds South diversification | 68 |
Table 43 Alternative Growth Media Trials | 73 |
Table 44: Summary of IEA Non-Compliances and Recommendations | 78 |
Table 45: 2020 Independent Environmental Audit Non-compliance Recommendations and Actions | 79 |
Table 46: 2020 Independent Environmental Audit Improvement Recommendations and Actions | 91 |
Table 47: Mt Arthur Coal's performance against targets for FY22 | 105 |
Page 5 of 128
ANNUAL REVIEW FY23
Table 1: Annual Review title block
Document Details
Name of Operation | Mt Arthur Coal |
Name of Operator | Hunter Valley Energy Coal Pty Ltd |
Project Approvals | PA 09_0062 (MOD 1) |
PA 06_0091 | |
Name of holder of project approvals | Hunter Valley Energy Coal Pty Ltd |
Mining Leases | CCL 744, CL 396, ML 1358, ML 1487, ML 1548, |
ML1593, ML1655, ML 1739, ML 1757, MPL 263 | |
Name of holder of mining leases | Hunter Valley Energy Coal Pty Ltd; Mt Arthur Coal |
Pty Limited | |
WAL 917, WAL 918, WAL 1296, WAL 18141, WAL | |
Water Licences | 18247, WAL 41495, WAL 41556, WAL 41557, WAL |
18175 | |
Name of holder of water licences | Hunter Valley Energy Coal Pty Ltd |
Forward Program Commencement Date | 1 August 2022 |
Forward Program Completion Date | 30 June 2025 |
Annual Review Commencement Date | 1 July 2022 |
Annual Review Completion Date | 30 June 2023 |
I, Hannah Farr, certify that this audit report is a true and accurate record of the compliance status of Mt Arthur Coal for the period 1 July 2022 to 30 June 2023 and that I am authorised to make this statement on behalf of Hunter Valley Energy Coal Pty Ltd.
Note. | ||
• | The Annual Review is an 'environmental audit' for the purposes of section 122B(2) of the Environmental Planning and | |
Assessment Act 1979. Section 122E provides that a person must not include false or misleading information (or | ||
provide information for inclusion in) an audit report produced to the Minister in connection with an environmental audit | ||
if the person knows that the information is false or misleading in a material respect. The maximum penalty is, in the | ||
case of a corporation, $1 million and for an individual, $250,000. | ||
• | The Crimes Act 1900 contains other offences relating to false and misleading information: section 192G (Intention to | |
defraud by false or misleading statement-maximum penalty 5 years imprisonment); sections 307A, 307B and 307C | ||
(False or misleading applications/information/documents-maximum penalty 2 years imprisonment or $22,000, or | ||
both). | ||
Name of authorised reporting officer | Hannah Farr | |
Title of authorised reporting officer | Manager HSE - Mt Arthur Coal | |
Signature of authorised reporting officer | ||
Date | 11/09/2023 | |
Page 6 of 128
ANNUAL REVIEW FY23
1 Statement of Compliance
A statement of Mt Arthur Coal's compliance with its project approvals and mining leases is presented in Table 2 with four identified non-compliances during the reporting period being discussed in Table 3.
Table 2: Statement of compliance
Were all conditions of the relevant approval(s) complied with?
PA 09_0062
EPL 11457
EPBC 2011/5866
EPBC 2014/7377
ML
YES
NO
YES
YES
YES
Table 3: Non-compliance summary
Relevant | Condition | Description | Compliance | Comment | Report | ||||||||||||||
approval | Summary | Status | Reference | ||||||||||||||||
EPL | O2.6 | Missing quarterly | Non-compliant | Written records of required STP quarterly | Section 11 | ||||||||||||||
11457 | STP records | (Administrative) | inspections misplaced. | ||||||||||||||||
EPL | Noise exceedance | Non-compliant | Misalignment between EPL and PA led to | ||||||||||||||||
R4.2 | noise exceedance in October 2021 not | Section 11 | |||||||||||||||||
11457 | not reported to EPA | (Administrative) | |||||||||||||||||
being reported to EPA. | |||||||||||||||||||
EPL | M2.3 | <100% data capture | Non-compliant | Communication error with device sending | Section 11 | ||||||||||||||
11457 | at Discharge Point 6 | (Low) | data to Water NSW and BHP systems. | ||||||||||||||||
EPL | M2.3 | <100% data capture | Non-compliant | Communication error with device sending | Section 11 | ||||||||||||||
11457 | at Discharge Point 6 | (Low) | data to Water NSW and BHP systems. | ||||||||||||||||
<100% data capture | Non-compliant | Monitor servicing; technical issues / | |||||||||||||||||
EPL | equipment malfunction; invalid data; and | ||||||||||||||||||
M2.2 | at dust Monitoring | Section 11 | |||||||||||||||||
11457 | (Low) | power outages all contributing to minor | |||||||||||||||||
Points | |||||||||||||||||||
data loss. | |||||||||||||||||||
Airblast overpressure exceedance of | |||||||||||||||||||
Blast incident | Non-compliant | 120.6 dB was recorded at Sheppard Ave. | |||||||||||||||||
EPL11457 | L6.3 | overpressure | Exceedance was notified to the DPE and | Section 11 | |||||||||||||||
(Low) | |||||||||||||||||||
exceedance | EPA. DPE determined no breach of | ||||||||||||||||||
approval occurred. | |||||||||||||||||||
Note: Compliance Status key for Table 3
Risk Level | Colour code | Description | |||||
High | Non-compliant | Non-compliance with potential for significant environmental consequences, regardless | |||||
of the likelihood of occurrence | |||||||
Medium | Non-compliant | Non-compliance with: | |||||
➢ | potential for serious environmental consequences, but is unlikely | to occur; or | |||||
➢ | potential for moderate environmental consequences, but is likely | to occur | |||||
Low | Non-compliant | Non-compliance with: | |||||
➢ | potential for moderate environmental consequences, but is unlikely to occur; or | ||||||
➢ | potential for low environmental consequences, but is unlikely to occur | ||||||
Administrative | Non-compliant | Only | to be applied where the non-compliance does not result in any risk of | ||||
non-compliance | environmental harm (e.g. submitting a report to government later than required under | ||||||
approval conditions) | |||||||
Page 7 of 128 |
ANNUAL REVIEW FY23
Acronyms
Acronyms | |
AHMP | Aboriginal Heritage Management Plan |
ARA | Annual rapid assessment |
BioMP | Biodiversity Management Plan |
BMP | Blast Management Plan |
CASA | Civil Aviation Safety Authority |
CCC | Community Consultative Committee |
CCL | Consolidated coal lease |
CHPP | Coal handling and preparation plant |
CL | Coal lease |
CRD | Cumulative rainfall departure |
DAWE | Commonwealth Department of Agriculture, Water and the Environment |
DoEE | Former Federal Department of the Environment and Energy is now part of DAWE |
DPE | NSW Department of Planning and Environment |
DRE | Former Division of Resources and Energy |
DRG | Former Division of Resources and Geoscience |
EA | Environmental assessment |
EIS | Environmental impact statement |
EL | Exploration licence |
EMS | Environmental management system |
EPA | NSW Environment Protection Authority |
EPBC | Environment Protection and Biodiversity Conservation Act 1999 |
EPL | Environment Protection Licence |
FY | Financial year |
GPA | Ground pasture assessment |
HRSTS | Hunter River Salinity Trading Scheme |
HSE | Health, Safety and Environment |
Page 8 of 128
ANNUAL REVIEW FY23
HVEC | Hunter Valley Energy Coal (Mt Arthur Coal) |
IROC | Integrated Remote Operations Centre |
MAC | Mt Arthur Coal |
ML | Mining lease |
MOP | Mining Operations Plan |
MSC | Muswellbrook Shire Council |
NGER | National Greenhouse and Energy Reporting Act 2007 |
NRAR | Natural Resources Access Regulator |
NSW | New South Wales |
OEH | NSW Office of Environment and Heritage |
PA | Project Approval |
RACI | Responsible, accountable, consult and inform |
RAW | Rapid assessment walkover |
ROM | Run of mine |
RR | NSW Resources Regulator |
UAV | Unmanned aerial vehicle |
VPA | Voluntary Planning Agreement |
VWP | Vibrating wire piezometers |