Statkraft has placed an order with the Nordex Group for the supply of seven N100/3300 turbines for the kilathmoy wind farm in Ireland. The contract also includes a Premium Service Agreement with a term of 20 years. The 23.1 megawatt ‘Kilathmoy’ wind farm is being built in county Kerry, near the border with Limerick, in the south-west of Ireland. The high generation capacity of the 3.3 MW turbine, along with the favourable wind speeds on the island, combine, resulting in a highly competitive cost of energy. Work is about to start on the infrastructure at the wind farm and the first turbines are to be installed in summer 2019. ‘Kilathmoy’ will be fully operative at the end of next year.