Black Cat Syndicate Limited announced the recommencement of RC drilling activities at Fingals Fortune and Imperial/Majestic which comprise part of the Kal East Gold Project. Highlights: RC drilling has recommenced at Kal East; One rig has started on a sterilisation program for the proposed processing and tailings storage facilities adjacent to Imperial/Majestic; Drilling at Fingals Fortune during the latter part of 2020, identified several new zones of mineralization; Accordingly, one RC rig has commenced the next program with a second due imminently. This program includes a substantial amount of infill drilling, designed to upgrade the JORC 2012 Mineral Resource ("Resource" or "Resources" as applicable). Better intersections from recent drilling 1 include: 7m @ 9.12 g/t Au from 18m (20FIRC105) – infill; 2m @ 19.20 g/t Au from 46m (20FIRC102) – extensional; 5m @ 5.63 g/t Au from 172m (20FIRC073) – extensional; 3m @ 7.14 g/t Au from 95m (20FIRC094) – extensional. Black Cat's +60,000m drilling program is progressing well with 34,000m drilled to 31 December 2020. Three RC rigs have commenced drilling which will continue throughout the March 2021 quarter. This work will assist with the conversion of Resources to Ore Reserves. Black Cat intends to drill, report and update Resources and studies on an ongoing basis. RC drilling activity will focus on the following programs through the March 2021 quarter: Imperial/Majestic: targeting Resource extensions and infrastructure sterilisation; Fingals Fortune: targeting Resource extensions and Resource conversion to Ore Reserves; Rowe's Find: targeting extensions of the existing Resource; Fingals Fortune East: targeting initial Resources at multiple deposits; Bulong: targeting Resource infill and exploration drilling; and Wombola: Resource extension and exploration drilling.