Aker BP ASA announced pro-forma production results for the year 2017. Pro-forma production in 2017 was 160 mboepd, including the production from Hess Norway. About 80% was oil and 20% gas.

The company provided production guidance for the year 2018. For the year 2018, production is expected to be between 155 and 160 mboepd, with an average production cost of $12 per boe. With its current portfolio, the company has the potential to produce 330 mboepd in 2023 (from both sanctioned and non-sanctioned projects), representing a compound average growth rate of 13%. The company announced capex guidance of $1.3 billion.