Voltalia: framework agreement with Taqa Arabia for a project
This framework agreement follows on from the protocol signed in December 2022 for this project will be implemented in two identical phases, each comprising a 500-megawatt electrolyzer powered by over 1.3 gigawatts of solar and wind energy.
The facility will have an annual production capacity in excess of 350,000 tonnes of hydrogen for each phase. It will be located on a greenfield site near the port of Ain Sokhna, in the Suez Canal Economic Zone.
Copyright (c) 2024 CercleFinance.com. All rights reserved.
Go to the original article.
Contact us to request a correction