Tres-Or Resources Ltd. announced that the Fontana Gold Project winter drill program is underway. Aurizon Mines Ltd. is the project Operator and plans to complete an initial 4,350 meters of NQ diamond drilling in the main area of the historic non-National 43-101 Fontana gold deposit, located in the Abitibi Greenstone Belt approximately 16 kilometers northeast of Amos, in Duverny Township, Quebec. The main goal of this drilling campaign will be to initially evaluate the potential for a large near surface deposit.

This first program includes 14 drill holes designed as a series of 1.0 kilometer long drilling fences to drill test intersecting mineralized structures following two perpendicular orientations. The first seven holes are designed to test historical drill holes with high grade gold intersections on known structures. An additional seven drill holes are planned where historical high grade gold values are known outside the main mineralized structures.