Rizal Resources Corporation announced that Gold Mining operation in the Southern Philippines, TMC Tribal Mining Corporation, has achieved another month of gold production in September. Activities at T'Boli are continuing to improve, with trial-mining rates of mineralized material achieving 80 tpd on the way to the target of 100 tpd. Milled tonnes averaged 69 tpd and head grade is improving reaching 4.57 g.t and recovery now at 85%. September saw the T'Boli process plant produce 8,794 grams or 283 Troy Ounces of Gold. Silver production was 21,785 grams or 700 ounces. Production was restored to normal routine after the Sodium Cyanide shortage in August. Total Gold produced since May is 31.1 kg or 1,000 ounces and Silver totals 92.4 kg or 2,971 ounces. Trial mining and processing activity continues in October on the way to higher production targets with stability and reliability in mine and process plant operations.