Orla Mining Ltd. provided an update on its exploration activities at Camino Rojo Sulphides, concluding the year on a positive note. Orla's 2023 Camino Rojo Sulphide drill program consisted of 37,677 metres of drilling across 56 drill holes. Sulphide Infill Program: This release includes the results of the remaining unreported 14 drill holes completed as part of the 52-drill hole, 35,070-metre infill program and builds on the results previously reported on June 22, 2023, and January 25, 2024.

Over three distinct campaigns covering a total of 50,924 drill metres, the Camino Rojo infill drill program, has consistently yielded impressive results setting the stage for an exciting year ahead. Camino Rojo SulphIDE infill drill result highlights: Camino Rojo sulphide infill drill result highlights: Hole CRSX23-28B: 3.21 g/t Au over 138.6 m (127.0m TW) incl. 9.15 g/t Au over 8.7 m incl.

11.4g/t Au over 1.45m and incl. 20.9g/t Au over 1.,5 m and incl. 12.2g/t Au over 1,3 m, Hole CRSX23-27B: 4.12 g/t Au over 43.0 m (37.7m TW) incl.

10.04 g/t Au over 11.5 m incl. 32.17 g/t over 2.0 m and incl. 14.45 g/t Au over 1.5 m and incl.

14. 45 g/t Au over1.5 m. Hole CRSX23- 28A: 2.40 g/t Au over 53.0 m (51.7m TW) incl., 14.0 g/t Au over 1.,2.41 g/t Au over 70.8 m (69.1m TW) incl. 9.,35 g/t Au over 1,5 m and incl.

19.35 g/t Au over1., 5.5 m and incl. 10.15 g/t Au across 1.5 m and Hole CRSX23-26: 4.42 g/t Au over 28.0 m (25.6m TW) incl. 23.5 g/t Au over 1".