Oil and Gas Development Company Limited referred to its previously disclosed information dated September 13, 2023, regarding production enhancement at Nashpa Well-10 through Rigless interventions in the Hangu-Lumshiwal formation, it was reported that the Well's production had been elevated to 1340 BPD of oil. A further increase in production at Nashpa Well-10 has been achieved through optimization initiatives including Rigless interventions i.e. perforation washes in the Datta, Shinawari, Samanasuk, Lumshiwal, and Hangu formations. Consequently, the total production from the Well has now reached 1870 BPD of oil and 7.02 MMSCFD of gas, which is being injected into the SNGPL network, besides recovery of 10 MTon/Day of LPG.