Marmota Limited announced that Phase 2 RC drilling at Aurora Tank (which adjourned on 17 December 2019 for the holiday break period) has recommenced. Of the planned 5,000m RC drilling, 3,068m was completed in December. If possible, the assay results on the first 3,068m drilled in December will be attained while the drill rig is still on site – if so, this will potentially allow Marmota to expand and accelerate Marmota’s exploration program at the Aurora Tank gold discovery, by following up any results of interest from the first 3,068m drilled in December. The Phase 2 program has multiple objectives and multiple targets including testing: NW flank Testing the size and extensions of the new NW flank. The new NW flank recently yielded outstanding intersections such as 5m @ 27 g/t gold (from 38m) including 1m @ 105g/t gold and was featured in ‘Top Drill Intersections per State – Australia – First Quarter 2019’ published by the RSC Mineral Intelligence Report (May 2019), Extensions to the N, NE and E of the Aurora Tank mineralised zone, Extensions at depth, New Two Fingers Zone To define the new gold intersection at the Two Fingers zone, located about 450m NE of the main mineralised zone. First recon over New Biogeochem Gold anomaly Tree sampling carried out in August has revealed a new gold-in-biogeochem anomalous zone – this time to the SE of the main mineralised zone. The timing is most fortuitous and enables Marmota to test the new anomaly at the same time as the main program.