Lithium Corporation advised investors drilling has commenced at the Company's Fish Lake Valley prospect in Esmeralda County, Nevada. Morella Corporation has mobilized a reverse circulation drill to Northern Fish Lake and will "pre-collar" two 200 foot (61 meter) holes. These holes will be cased and cemented to depth to facilitate the later extension of the holes utilizing a core rig.

Both holes are eventually slated to be drilled to 1200 feet (366 meters) to test the geophysical conductors at these separate and discrete locations on the east side of the playa, proximal to where boron/lithium enriched brine was produced in the 1800's to recover the boron content. The drill campaign and earlier geophysical ground survey work are part of Morella's bid to earn an initial 60% interest in the Fish Lake Valley project. Morella is also the Optionee on Lithium Corporation's North Big Smoky Carvers prospect in Nye County, Nevada.