LAURION Mineral Exploration Inc. reported final assay results for the remaining two (2) drill holes of the ten (10) hole, 2,962 m Phase 2 drill campaign, completed at the Ishkoday Project. The Ishkoday Project is located approximately 220 km northeast of Thunder Bay, Ontario, near the town of Beardmore in the Onaman-Tashota Greenstone Belt. Discussion of Mineralization: The mineralized area, known historically as Area D, was drilled by Farboro Resources in 1987 with seven shallow holes to a maximum vertical depth of 140 m and restricted to 200 m along strike. The best historic mineralized intersection, drilled prior to the introduction of current standards under N.I. 43-101, was in hole 88-33, which intersected 18.7 m grading 0.30 g/t gold, 4.31 g/t silver, 0.15 % copper and 1.18 % zinc. Hole LME20-030 was a twin of historic hole 88-33 and hole LME20-031 was designed as a follow-up to further test mineralization down dip. The widening mineralized interval in hole LME20-031, which occurs between a vertical depth of 250- 305 m, establishes and validates this new exploration target. Hole LME20-030: 141.5 to 160.0 m – Precious and base metal mineralization is hosted in a shear zone. Hole LME20-031: 352.5 to 371.0 m – Precious and base metal mineralization is hosted in a shear zone, corresponding to the sheared mineralization in hole LME20-030; 392.3 to 397.7 m - Mineralization occurs in fine quartz veining in a potentially sheared interval, including semi-massive chalcopyrite veins; 402.0 to 423.15 m – Mineralization occurs in blebby chalcopyrite.