The Board of Directors of ISOTeam Ltd. announced that the Group has received the following contracts, worth approximately $22.65 million in aggregate: Solar leasing of grid-tied solar photovoltaic system for 150 HDB blocks with a contract value of approximately $6.27 million. The contract was awarded by Sunseap Leasing Pte Ltd. and is expected to be completed by January 2018; Repair and redecoration works to Block 665 Buffalo Road (Tekka Centre) with a contract value of approximately $3.29 million. The contract was awarded by Tanjong Pagar Town Council and is expected to be completed by 30 November 2017; Proposed new erection of a 3 storey envelope control detached house with basement, attic and swimming pool on Lot 3216C MK17 at 106 Watten Estate Road (Bukit Timah Planning Area) with contract value of approximately $3.25 million. The contract was awarded by individual home owner and is expected to be completed in 20 June 2018; Repair and redecoration works in Tiong Bahru market and food centre with a contract value of approximately $2.26 million. The contract was awarded by National Environment Agency and is expected to be completed by 30 October 2017; Repairs and repainting works for the Dairy Farm Estate at No. 1 Dairy Farm Road, Singapore 679033 with a contract value of approximately $1.30 million. The contract was awarded by ORTUS ASIA Consulting Pte Ltd. and is expected to be completed by 31 December 2017. Proposed addition and alteration works to existing Starz Restaurant at Hard Rock Hotel Level 2, at Resorts World Sentosa with a contract value of approximately $1.27 million. The contracts were awarded by Resorts World at Sentosa Pte. Ltd. and are expected to be completed in January 2017; Fit-out works for Burberry Mainline Store at Ion Orchard, Singapore with contract value of approximately $0.96 million. The contracts were awarded by TED Concept International (S) Pte Ltd. and are expected to be completed in March 2017; Repair and redecoration works to the Ministry of Health with a contract value of approximately $0.90 million. The contract was awarded by Ministry of Health and is expected to be completed by August 15, 2017; Reroofing works to 19 blocks at Block 109 ­ 110, 112 ­ 115 and 117 ­ 129 Pasir Ris Street 11, and 3 blocks at Block 8 to 10 Selegie Road (Kampong Glam Division) with a contract value of $0.76 million. The contract was awarded by Pasir Ris-Punggol Town Council and Jalan Besar Town Council and is expected to be completed by 31 January 2018 and 30 April 2017 respectively; Renovation works at block 513 Bishan Street 13, #01-502 (Ground and 2nd Floor) and #01-504 (2nd Floor) with a contract value of approximately $0.33 million. The contract was awarded by Marie France Bodyline (S) Pte Ltd. is expected to be completed by 21 January 2017; Supply and lay of turfing, trees, planting strip with associated planting media, landscaping works, testing and commissioning works and all others necessary accessories works for the proposed new erection of a 4/5 storey (with basement car park) civic centre (Wisma Geylang Serai) with ancillary facilities on Lot MK 23-07408W Geylang Serai (Geylang) ­ BDT11/15A with a contract value of approximately $0.27 million. The contract was awarded by Pal-Link Construction Pte Ltd. and is expected to be completed by 14 January 2018; and Proposed Youth Hub expansion at Living Waters Methodist Church at 121 Dover Road, Singapore 139650 with a contract value of approximately $0.13 million. The contract was awarded by Living Waters Methodist Church and is expected to be completed by 30 January 2017.