GTT will design the tanks of these six vessels, which will each offer a capacity of 174,000 m3. The tanks will be fitted with the membrane containment system NO96 Super+ developed by GTT.
The delivery of the vessels is scheduled between the third quarter of 2027 and the fourth quarter of 2028.
Media contact:
press@gtt.fr/ + 33 (0)1 30 23 48 45
Investor Relations contact:
information-financiere@gtt.fr/ + 33 (0)1 30 23 20 87
>Download in .pdf
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
GTT – Gaztransport & Technigaz SA published this content on 03 January 2023 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 03 January 2023 16:57:02 UTC.