MINE STATISTICS

ON A QUARTERLY BASIS

ITY

HOUNDÉ

MANA

BOUNGOU

SABODALA-MASSAWA

WAHGNION

(on a 100% basis)

Q3-2022

Q2-2022

Q3-2021

Q3-2022

Q2-2022

Q3-2021

Q3-2022

Q2-2022

Q3-2021

Q3-2022

Q2-2022

Q3-2021

Q3-2022

Q2-2022

Q3-2021

Q3-2022

Q2-2022

Q3-2021

Physicals

Total tonnes mined - OP1

000t

4,925

6,027

5,576

9,178

10,725

11,966

76

837

5,114

3,559

5,115

7,126

11,761

12,777

11,515

8,249

9,437

6,154

Total ore tonnes - OP

000t

1,180

1,668

1,690

1,174

1,330

596

76

376

592

210

272

539

1,297

1,717

1,717

841

805

917

OP strip ratio1 (total)

W:t ore

3.17

2.61

2.30

6.82

7.06

19.07

0.00

1.23

7.64

15.95

17.81

12.22

8.07

6.44

5.71

8.81

10.72

5.71

Total ore tonnes - UG

000t

-

-

-

-

-

-

250

196

199

-

-

-

-

-

-

-

-

Total tonnes milled

000t

1,375

1,597

1,530

1,234

1,217

1,142

691

652

667

338

366

349

1,034

1,048

1,079

939

997

809

Average gold grade milled

g/t

2.04

1.77

1.50

1.83

2.42

2.11

1.90

2.83

2.50

2.84

2.47

3.76

2.84

2.38

3.32

1.13

0.90

1.40

Recovery rate

%

87%

86%

83%

92%

94%

92%

92%

90%

91%

94%

93%

95%

88%

89%

90%

92%

92%

93%

Gold ounces produced

oz

80,897

76,871

61,494

72,302

87,008

70,209

41,667

54,768

49,101

29,275

27,005

40,844

86,293

72,904

105,913

32,309

26,548

34,145

Gold sold

oz

78,387

75,753

63,403

75,248

85,979

75,381

41,453

54,232

48,762

30,199

27,305

41,286

81,988

73,523

107,547

30,779

26,896

35,360

Unit Cost Analysis

Mining costs - OP

$/t mined

4.75

4.60

3.92

3.21

2.83

2.16

7.89

9.68

4.55

3.96

3.52

2.25

2.25

2.13

2.31

3.14

2.95

3.06

Mining costs - UG

$/t mined

-

-

-

-

-

-

70.60

58.45

70.20

-

-

-

-

-

-

-

-

-

Processing and maintenance

$/t milled

15.35

15.59

13.40

11.35

11.75

13.97

19.54

20.55

18.10

34.32

28.42

30.79

15.77

15.74

11.48

12.56

10.23

12.19

Site G&A

$/t milled

4.87

4.70

4.08

5.67

5.92

5.19

7.24

8.59

5.30

17.16

12.30

12.68

8.22

8.01

7.40

4.90

5.01

6.81

Cash Cost Details

Mining costs - OP1

$000s

23,400

27,700

21,900

29,500

30,300

25,800

600

8,100

23,300

14,100

18,000

16,000

26,500

27,200

26,600

25,900

27,800

(18,800)

Mining costs - UG

$000s

-

-

-

-

-

0

25,700

20,400

16,900

-

-

0

-

-

0

-

-

0

Processing and maintenance

$000s

21,100

24,900

20,500

14,000

14,300

15,900

13,500

13,400

12,100

11,600

10,400

10,700

16,300

16,500

12,400

11,800

10,200

9,900

Site G&A

$000s

6,700

7,500

6,300

7,000

7,200

5,900

5,000

5,600

3,500

5,800

4,500

4,400

8,500

8,400

8,000

4,600

5,000

5,500

Capitalized waste

$000s

(2,400)

(1,500)

(2,700)

(17,900)

(5,000)

(16,500)

(12,800)

(10,100)

(11,600)

(3,400)

(8,400)

(5,200)

(10,100)

(6,600)

(4,300)

(3,700)

(8,400)

(3,600)

Inventory adj. and other

$000s

1,500

(4,700)

400

6,000

2,200

7,900

6,100

4,200

(1,800)

4,300

(400)

(700)

5,700

(3,700)

(300)

3,100

(100)

0

Royalties

$000s

7,800

7,000

6,200

8,900

11,100

8,400

4,300

6,100

5,700

3,000

3,100

4,400

7,600

7,400

10,500

3,700

3,400

4,200

Total cash costs for ounces sold

$000s

58,100

60,900

52,500

47,500

60,100

47,500

42,400

47,700

48,100

35,400

27,200

29,600

54,500

49,200

52,900

45,400

37,900

34,800

Sustaining capital

$000s

2,500

6,900

5,500

6,400

9,300

21,900

3,100

1,400

2,100

1,377

1,800

3,400

9,400

8,100

17,500

5,300

10,200

4,100

Total cash cost

$/oz

741

804

828

631

699

631

1,023

880

986

1,172

996

717

665

669

492

1,475

1,409

983

Mine-level AISC

$/oz

773

895

915

716

807

921

1,098

905

1,029

1,219

1,062

800

779

779

655

1,647

1,788

1,097

1) Includes waste capitalized.

1

ON A YEAR TO DATE BASIS

(on a 100% basis)

ITY

KARMA

HOUNDÉ

MANA

BOUNGOU

SABODALA-MASSAWA

WAHGNION

YTD-2022

YTD-2021

YTD-2022

YTD-2021

YTD-2022

YTD-2021

YTD-2022

YTD-2021

YTD-2022

YTD-2021

YTD-2022

YTD-2021

YTD-2022

YTD-2021

Physicals

Total tonnes mined - OP1

000t

17,902

18,326

3,747

16,330

32,589

37,620

2,557

20,834

15,008

22,145

36,614

28,144

27,859

18,220

Total ore tonnes - OP

000t

5,382

5,672

709

3,889

3,842

3,620

922

1,496

734

1,136

4,722

4,884

2,746

2,753

Open pit strip ratio1 (total)

W:t ore

2.33

2.23

4.28

3.20

7.48

9.39

1.77

12.93

19.45

18.50

6.75

4.76

9.15

5.62

Total ore tonnes - UG

000t

-

-

-

-

-

-

645

658

-

-

-

-

-

-

Total tonnes milled

000t

4,641

4,624

768

3,911

3,684

3,396

1,964

1,942

1,053

1,000

3,136

2,696

2,910

2,363

Average gold grade milled

g/t

1.82

1.74

0.57

0.77

2.06

2.15

2.54

2.62

2.78

4.34

2.78

3.11

1.00

1.35

Recovery rate

%

84%

81%

67%

66%

93%

92%

91%

91%

94%

95%

89%

90%

92%

94%

Gold ounces produced

oz

230,169

211,863

10,246

67,197

232,375

215,895

149,002

150,667

90,121

139,393

255,523

240,717

87,746

99,795

Gold sold

oz

226,810

221,263

10,107

68,704

233,723

219,239

149,880

159,085

93,342

137,119

249,509

258,563

87,572

112,738

Unit Cost Analysis

Mining costs - Open pit

$/t mined

4.25

3.83

2.03

2.18

2.71

2.04

7.16

3.47

3.26

2.41

2.22

2.67

2.89

2.75

Mining costs - UG

$/t mined

-

-

-

-

-

-

63.45

68.50

-

-

-

-

-

-

Processing and maintenance

$/t milled

14.52

13.50

6.12

6.35

11.35

13.68

20.06

18.58

31.05

32.68

14.52

11.69

11.20

10.47

Site G&A

$/t milled

4.52

3.63

2.73

2.08

5.32

5.24

8.11

5.45

14.34

11.81

8.42

6.53

5.20

6.02

Cash Cost Details

Mining costs - Open pit1

$000s

76,100

70,100

7,600

35,600

88,200

76,800

18,300

72,200

49,000

53,400

81,500

75,300

80,600

50,200

Mining costs -Underground

$000s

-

-

-

-

-

-

67,400

59,200

-

-

-

-

-

-

Processing and maintenance

$000s

67,400

62,400

4,700

24,800

41,800

46,500

39,400

36,100

32,700

32,700

45,500

31,500

32,600

24,700

Site G&A

$000s

21,000

16,800

2,100

8,200

19,600

17,800

15,900

10,600

15,100

11,800

26,400

17,600

15,100

14,200

Capitalized waste

$000s

(5,100)

(11,300)

-

-

(26,400)

(26,000)

(31,400)

(51,900)

(21,200)

(23,700)

(24,400)

(7,900)

(16,300)

(5,600)

Inventory adjustments and other

$000s

(11,700)

6,200

(900)

500

5,700

6,100

15,400

3,300

7,300

3,600

(8,100)

(5,500)

(5,800)

3,900

Royalties

$000s

22,700

21,700

1,700

10,300

29,200

26,200

16,500

18,800

10,100

14,700

24,900

25,400

11,000

13,700

Total cash costs for ounces sold

$000s

170,400

165,800

15,200

79,300

158,100

147,400

141,500

148,300

93,000

92,500

145,800

136,500

117,200

101,200

Sustaining capital

$000s

10,900

17,900

-

500

21,100

35,200

7,300

10,200

5,100

16,500

29,700

36,000

22,000

7,500

Total cash cost

$/oz

751

749

1,504

1,155

676

672

944

932

996

675

584

528

1,338

897

Mine-level AISC

$/oz

799

830

1,504

1,162

767

833

993

996

1,051

795

703

667

1,590

964

1) Includes waste capitalized. 2)For the post acquisition period commencing February 10, 2021.

2

QUALIFIED PERSONS

Mark Morcombe, COO of Endeavour Mining PLC., a Fellow of the Australasian Institute of Mining and Metallurgy, is a "Qualified Person" as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") and has reviewed and approved the technical information in this document.

NON-GAAP MEASURES

Some of the indicators used by Endeavour in this press release represent non-IFRS financial measures, including "all-in margin", "all-in sustaining cost", "net debt", "EBITDA", "adjusted EBITDA", "net debt to adjusted EBITDA ratio", "cash flow from continuing operations", "total cash cost per ounce", "sustaining and non-sustaining capital", "net earnings", "adjusted net earnings", "operating cash flow per share", and "return on capital employed". These measures are presented as they can provide useful information to assist investors with their evaluation of the pro forma performance. Since the non-IFRS performance measures listed herein do not have any standardized definition prescribed by IFRS, they may not be comparable to similar measures presented by other companies. Accordingly, they are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Please refer to the non-GAAP measures section of the Company's most recently filed management discussion and Analysis for a

reconciliation of the non-IFRS financial measures used in this press release.

3

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Endeavour Mining plc published this content on 10 November 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 10 November 2022 07:06:05 UTC.