Elementos Limited has intersected further tin mineralisation zones at its Oropesa Tin Project, Spain, after receiving assay results from the final infill drill hole from its 2022 Mineral Resource upgrade drilling program. Drilling aims to upgrade the remaining Inferred Mineral Resources that sit within the 2022 Optimisation Study4 USD 30,000/t pit shell. Drill hole ADD_33 returned three significant zones of tin mineralisation.

11.2m @ 0.51% Sn & 1.37% Zn from 86.2m, 4.6m @ 0.34% Sn & 0.15% Zn from 119.3m, 20.2m @ 0.18% Sn & 0.07% Zn from 131.4m (0.1% Sn cut-off grade).