Cyprium Metals Limited announced that Reverse Circulation ("RC") drilling completed in December 2019 at the Hollandaire prospect has intersected a significant extensional mineralisation that is 18.0 metres thick in drillhole 19HORC029. This drillhole is 116 metres down dip from drillhole 12HODD034 which returned a mineralised interval of 14.0m at 2.03% Cu, 0.22 g/t Au and 6.04 g/t Ag from 254m downhole, as previously reported by Silver Lake Resources (SLR) in 2012. Drillhole 12HODD034 was previously deepest recorded drillhole intersection of mineralisation at the Hollandaire prospect. Cue Copper Project Drilling Results: RC drilling at the Hollandaire prospect has intersected a significant extensional mineralisation of 18.0m @ 1.97% Cu in drillhole 19HORC029 from 295m downhole including: 12.0m @ 2.74% Cu with 0.61 g/t Au and 6.75 g/t Ag from 295m; 8.0m @ 3.63% Cu with 0.84 g/t Au and 8.94 g/t Ag from 296m 3.0m @ 6.10% Cu with 2.61 g/t Au and 16.25 g/t Ag from 296m. The assay results from Hollandaire drillholes 19HORC030 to 19HORC038 are pending and will be released as separate announcement when received and will be taken into consideration for the next phase of extensional drilling at Hollandaire. This drilling is expected to commence later in January 2020 after the planned phase 3 drilling has been completed at Eelya South. EELYA SOUTH: The RC drilling programme completed in November and December 2019 at the Eelya South prospect comprised 13 drillholes which targeting the down-dip extensions of the structure. Of the RC drilling completed, 11 drillholes were included in phase one and two designs targeting the shallowest section of the structure and has intersected a depleted zone of the structure, including: 19ESRC001: 1.0m @ 1.36% Cu with 0.04 g/t Au and 1.00 g/t Ag from 47m; 19ESRC007: 1.0M @ 1.32% Cu with 0.18 g/t Au and 29.50 g/t Ag from 46m. An RC drillhole of the phase 3 programme was completed to target a deeper section of the structure and has intersected sulphide material below the depletion zone, which included 11.0m @ 0.64% Cu, 0.13 g/t Au and 6.64 g/t Ag from 58m downhole including: 3.0m @ 1.34% Cu, 0.40 g/t Au and 19.83 g/t Ag from 61m. The initial assay results received to date have been very encouraging and the remainder of the planned three phase RC drilling programme of 2,430 metres at Eelya South will be completed by the end of January 2020. The assay results from the January 2020 RC drilling are expected to be available during the first quarter of 2020. RC drillhole 19ESRC013 was used for downhole geophysical investigations that was conducted on 12 January 2020. The geophysical results are expected by the end of January 2020 and will be used, in conjunction with RC drilling assay results to design the next phases of drilling to outline further mineralisation at the Eelya South prospect.