CTEEP Companhia de Transmissão de Energia Eletrica Paulista S A : 05/12/2021 Institutional Presentation 1Q21
May 12, 2021 at 05:22 pm
Share
INSTITUCIONAL PRESENTATION
R E S U L T S | 1 Q 2 1
ISAVisão
CTEEPgeral
ISA CTEEP in the Transmission Sector
Sustainable Value
Financial Highlights
WHY INVEST IN
ISA CTEEP
Strong Cash Generation
No demand risk and low default risk
Dividends
Minimum payout of 75% (regulatory net income)
Benchmark
Reference
Company in quality and O&M
Growth
Opportunities in retrofitting, greenfield projects and M&A
Profitability
Sustainable value creation
Investment
Grade
Fitch: AAA(bra)
Valuation
Attractive valuation
Why invest in ISA CTEEP
Growth strategy with sustainable value generation to be shared with stakeholders
Strong cash
generation allows
Operational Excellence
Existing assets
Growth
New businesses
growth with
management
Greenfield and M&A
dividend distribution
and Efficiency
Retrofitting
Sustainability
Maximize value generation to share with stakeholders
4
Madeira (51%)
LT: 2.4 thousand km
ISA CTEEP
Substation: 7.5 thousand MVA
RAP2020/2021 cycle¹: BRL282 million
Largest publicly traded pure transmission utility in Brazil
Transmission of 33% of Brazil's energy generation and 94% of the energy in the State of São Paulo
Benchmark player in costs and quality
Aguapeí³(100%)
LT: 121 km
OPERATIONAL
Substation: 1.400 MVA
RAP 2020/2021 cycle: BRL60 million
ASSETS
Itapura - Bauru (100%)
Static Compensator: 250 MVAr
18.8 thousand km of transmission lines
RAP 2020/2021 cycle: BRL12 million
Pinheiros (100%)
69 thousand MVA of transformation
Substation: 4.2 thousand MVA
capacity
LT: 1 km
RAP 2020/2021 cycle: BRL63 million
129 substations
Transmission Line (LT)
Serra do Japi (100%)
LT: 137 km
RAP of BRL4 billions¹
Consolidated subsidiary
Substation: 2 thousand MVA
RAP 2020/2021 cycle: BRL56 million
LT consolidated subsidiary
Non-consolidated subsidiary
IESUL (100%)
LT: 167 km
Note:
LT non-consolidated subsidiary
Substation: 900 MVA
¹ RAP 2020/2021 cycle adjusted to ISA CTEEP's participation
2
IE Tibagi's RAP does not consider adjustment resulting from the
RAP 2020/2021 cycle: BRL20 million
contractual amendment (-13.5%), approved by ANEEL's Board on 10/26/20
IENNE (100%)
LT: 710 km
Substation: N/A
RAP 2020/2021 cycle: BRL53 million
Garanhuns (51%)
LT: 633 km
Subestation: 2.1 thousand MVA
RAP 2020/2021 cycle: BRL48 million
Evrecy (100%)
LT: 163 km
Subestation: 450 MVA
RAP 2020/2021 cycle: BRL13 million
IEMG (100%)
LT: 173 km
Substation: N/A
RAP 2020/2021 cycle: BRL20 million
ISA CTEEP
PBTE (100%)
LT: 14,3 mil km
LT: 30 km
Substation : 48,8 mil MVA
Substation: N/A
RAP 2020/2021 cycle: BRL3.1 billion
RAP 2020/2021 cycle: BRL172
Itaquerê (100%)
million
Synchronous Components: 900
MVAr
RAP 2020/2021 cycle: BRL52 million
Tibagi² (100%)
LT: 17 km
Substation : 500 MVA
RAP 2020/2021 cycle: BRL21 million
This is an excerpt of the original content. To continue reading it, access the original document here.
Attachments
Original document
Permalink
Disclaimer
CTEEP - Companhia de Transmissão de Energia Elétrica Paulista published this content on 12 May 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 12 May 2021 21:21:03 UTC.
CTEEP - Companhia de Transmissao de Energia Eletrica Paulista is a Brazil-based public company which engages in the electric utilities sector. The Company is an electric power public service concessionaire, and is principally engaged in the transmission of energy, which requires planning, infrastructure implementation, and operation and maintenance of subordinated power transmission systems. The Company additionally makes investments, manages research & development programs related to power transmission and other activities related to the technology available and is present and operates in a range of different states through its subsidiaries. The Company is a subsidiary of ISA Capital do Brasil SA.