Information on parameters at Unit 1:
- Unit is in the operation
- Turbine generator output - 1098 MWe
- Electricity production since the beginning of the year: 7 346 962 MWh
Information on parameters at Unit 2:
- Unit is in the operation
- Turbine generator output - 1103 MWe
- Electricity production since the beginning of the year: 7 194 959 MWh
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
CEZ a.s. published this content on 07 December 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 07 December 2021 08:41:02 UTC.