Car Carolina Rush Corporation announced a 3,000-meter core drill program will commence on April 29 at its Brewer Gold-Copper Project in South Carolina. Within the 62.5-meter interval, a 2.5-meter zone of high-grade gold-telluride mineralization (2.5 m @ 169.0 g/t Au) was identified and will be the focus of the initial drill holes. The core sample displays the nature of the gold-tellurides, which occur in quartz veins and as disseminated grains and patches within intensely altered (quartz-pyrophyllite) volcanic host rock.
Market Closed -
Other stock markets
|
5-day change | 1st Jan Change | ||
0.23 CAD | +4.55% | +4.55% | +12.20% |
04-24 | Carolina Rush Corporation to Commence New Drill Program At Brewer Gold-Copper Project | CI |
04-22 | Carolina Rush Corporation Reports Earnings Results for the Full Year Ended December 31, 2023 | CI |
1st Jan change | Capi. | |
---|---|---|
+12.20% | 9.53M | |
+5.68% | 49.37B | |
+27.82% | 34.29B | |
+1.63% | 30.74B | |
+18.69% | 25.33B | |
+7.62% | 11.46B | |
+35.96% | 10.28B | |
+35.66% | 9.63B | |
-.--% | 8.72B | |
+10.06% | 8.52B |
- Stock Market
- Equities
- RUSH Stock
- News Carolina Rush Corporation
- Carolina Rush Corporation to Commence New Drill Program At Brewer Gold-Copper Project