Brahmaputra Infrastructure Limited one of the JV member of (VKGA-Brahmaputra- Tribeni (JV)) has received a letter of reward for execution of the Construction of foundation and sub structure over pile foundation for Tall Bridge no. 89 (3*103.50M steel girder) at Ch: 30400 and bridge no.196 (2*78.80m +2*103.50m Steel Grider) at CH: 48865 m including all other ancillary works and protection works in between stations Bairabi and Sairang in connection with the Construction of new BG Railway line from Bairabi to sairang (Mizoram) for the Contract price of INR 1,265.0 million (Approx) from the Office of Chief Engineer /Construction -II North East Frontier Railway, Maligaon, Guwahati -11.