Bondada Engineering Limited has received a work order from M/s. Pace Digitek Infra Private Limited, M/s. Pace Digitek Infra Private Limited has granted work order to M/s. Bondada Engineering Limited for supply of 40M Ground Based Towers-200 KMPH amounting to INR 240,120,855/-Including GST). Time period by which the order(s)/contract(s) 1s to be executed On or before March 31, 2024.
Market Closed -
Other stock markets
|
5-day change | 1st Jan Change | ||
1,766 INR | +3.47% | -1.69% | +344.54% |
1st Jan change | Capi. | |
---|---|---|
+344.54% | 443M | |
0.00% | 71.05B | |
+3.02% | 60.42B | |
+29.58% | 40.94B | |
+18.09% | 32.63B | |
+9.69% | 29.08B | |
+18.31% | 21.44B | |
+10.92% | 18.84B | |
+82.74% | 18.5B | |
+35.92% | 17.21B |
- Stock Market
- Equities
- 543971 Stock
- News Bondada Engineering Limited
- Bondada Engineering Limited Receives Work Order from M/S. Pace Digitek Infra Private Limited