Note: All guidance is subject to further potential impacts from COVID-19 during the 2023 financial year.

We continue to deliver safe and reliable production. We remained fatality free during the year and have delivered record sales volumes from Western Australia Iron Ore (WAIO), allowing us to fully capitalise on the opportunity presented by high iron ore prices.

Full year production guidance for iron ore and energy coal were achieved, as were revised guidance for copper and metallurgical coal. Full year nickel production was lower than revised guidance due to a smelter outage in the June 2022 quarter.

Full year unit cost guidance1 is expected to be achieved for WAIO and Escondida. New South Wales Energy Coal (NSWEC) unit costs are expected to be towards the bottom end of revised guidance, which was updated to reflect a targeted increase in the proportion of higher quality energy coal to capture more value from record high prices. BMA unit costs are expected to be marginally above revised guidance for Queensland Coal primarily due to the impact of the divestment of BMC.

The Jansen shaft project was completed in the June 2022 quarter. Jansen Stage 1 is tracking to plan, with activities progressing at the port and at the Jansen site. We are working to bring forward Jansen Stage 1 first production into 2026 and are assessing options to accelerate Jansen Stage 2.

The divestment of BHP's 80% interest in BMC to Stanmore and the merger of BHP's oil and gas portfolio with Woodside Energy were completed during the June 2022 quarter.

BHP announced that it will retain NSWEC in its portfolio and seek relevant approvals to enable mining beyond the current mining consent that expires in 2026, towards a cessation of mining in 2030.

The financial results for the second half of the 2022 financial year are expected to reflect certain items as summarised in the table on page 3.

Production

FY22
(vs FY21)
Jun Q22
(vs Mar Q22)

Jun Q22 vs Mar Q22 commentary

Copper (kt)


1,573.5

(4%)



461.8
25%

Higher volumes at Escondida due to increased grade and concentrator throughput, at Spence due to improved leaching performance and at Olympic Dam following major smelter maintenance campaign impacts in the prior period.

Iron ore (Mt)


253.2
0%


64.2
8%

Higher volumes at WAIO reflecting record production from the Mining Area C hub with the continued ramp up of South Flank and improved supply chain performance.

Metallurgical coal (Mt)2


29.1
(9%)


8.2
3%

Higher volumes driven by improved truck productivity, partially offset by heavy rainfall in the quarter.

Energy coal (Mt)3


13.7
(4%)


3.9
52%

Higher volumes due to less wet weather and reduced COVID-19 related labour impacts.

Nickel (kt)


76.8
(14%)


18.8
1%

Higher volumes due to reduced COVID-19 labour impacts, offset by an unplanned smelter outage.

Group copper equivalent production for the 2022 financial year decreased by 4%4 mainly due to lower copper and coal volumes. Group copper equivalent production for the 2023 financial year is expected to increase by approximately 4% from the 2022 financial year.

BHP Operational Review for the year ended 30 June 2022 1

Summary

BHP Chief Executive Officer, Mike Henry:

"BHP produced a strong fourth quarter to cap off a year of significant progress. Our performance for the year has been underpinned by safe, reliable operations and firm demand for our commodities. We completed another year fatality free and we are unwavering in our effort to improve safety, and this includes addressing sexual assault and harassment, racism and bullying.

We delivered record full-year sales volumes at our iron ore business in Western Australia as a result of reliable operational performance and the South Flank project which continued to ramp up. In copper, Escondida in Chile had record material mined and near-record concentrator throughput, while Olympic Dam in South Australia performed strongly in the fourth quarter after planned smelter maintenance.

Queensland metallurgical coal delivered strong underlying performance for the quarter in the face of significant wet weather. BHP is assessing the impacts on BMA economic reserves and mine lives as a result of the increase in coal royalties by the Queensland Government. The near tripling of top end royalties has worsened what was already one of the world's highest coal royalty regimes, threatening investment and jobs in the state.

Our US$5.7 billion Jansen potash project in Canada is tracking to plan and we are working to bring first production forward to 2026. Also during the year, we merged our petroleum business with Woodside, completed the sales of BMC and Cerrejón, and decided to retain New South Wales Energy Coal until the cessation of mining in 2030 subject to relevant approvals. We also unified our corporate structure, and added to our global options in copper and nickel.

Broader market volatility continues and we expect the lag effect of inflationary pressures to continue through the 2023 financial year, along with labour market tightness and supply chain constraints. Over the year ahead, China is expected to contribute positively to growth as stimulus policies take effect, however, the continuing conflict in the Ukraine, the unfolding energy crisis in Europe and policy tightening globally is expected to result in an overall slowing of global growth. Our strong focus on safety, operational reliability, cost control and social value will help us navigate these challenges and continue to deliver for all of our stakeholders."

Operational performance

Production and guidance are summarised below.

Note: All guidance is subject to further potential impacts from COVID-19 during the 2023 financial year.

Productioni

FY22 Jun
Q22
FY22
vs
FY21
Jun Q22
vs
Jun Q21
Jun Q22
vs
Mar Q22
FY23
guidance
FY23e
vs FY22

Copper (kt)

1,573.5 461.8 (4%) 15% 25% 1,635 - 1,825 4% - 16%

Escondida (kt)

1,004.0 289.3 (6%) 17% 28% 1,080 - 1,180 8% - 18%

Pampa Norte (kt)

281.2 77.2 29% 11% 13% 240 - 290 (15%) - 3%

Olympic Dam (kt)

138.4 55.7 (33%) 10% 43% 195 - 215 41% - 55%

Antamina (kt)

149.9 39.6 4% 10% 10% 120 - 140 (20%) - (7%)

Iron ore (Mt)

253.2 64.2 0% (2%) 8% 249 - 260 (2%) - 3%

WAIO (Mt)

249.2 63.2 (1%) (2%) 8% 246 - 256 (1%) - 3%

WAIO (100% basis) (Mt)

282.8 71.7 0% (2%) 7% 278 - 290 (2%) - 3%

Samarco (Mt)

4.1 1.0 110% (2%) 1% 3 - 4 (26%) - (2%)

Metallurgical coal - BMA (Mt)

29.1 8.2 (9%) (12%) 3% 29 - 32 0% - 10%

Metallurgical coal - BMA (100% basis) (Mt)

58.3 16.4 (9%) (12%) 3% 58 - 64 0% - 10%

Energy coal - NSWEC (Mt)

13.7 3.9 (4%) (13%) 52% 13 - 15 (5%) - 9%

Nickel (kt)

76.8 18.8 (14%) (16%) 1% 80 - 90 4% - 17%
i

Excludes BMC and Petroleum production. The divestment of BHP's 80 per cent interest in BMC to Stanmore Resources Limited and the merger of BHP's oil and gas portfolio with Woodside Energy Group Limited were completed on 3 May 2022 and 1 June 2022 respectively. Production data for these assets are below in the production and sales report.

BHP Operational Review for the year ended 30 June 2022 2

Summary of disclosures

BHP expects its financial results for the second half of the 2022 financial year to reflect certain items as summarised in the table below. The table does not provide a comprehensive list of all items impacting the period. The financial statements are the subject of ongoing work that will not be finalised until the release of BHP's financial results on 16 August 2022. Accordingly the information in the table below contains preliminary information that is subject to update and finalisation.

Description

H2 FY22
impact
US$Mi

Classificationii

Unit costs for WAIO, Escondida and NSWEC are expected to be in line with full year guidance (at guidance exchange rates), with NSWEC tracking towards the bottom end of revised guidance Note: weaker Australian dollar and Chilean peso than guidance rates in the periodiii

- Operating costs

Unit costs for BMA are expected to be marginally above full year revised guidance for Queensland Coal, due to the impact of the divestment of BMC, and higher diesel and electricity prices (at guidance exchange rates) Note: weaker Australian dollar than guidance rates in the periodiii

- h Operating costs

Impairment charge related to an increase in closure and rehabilitation provision at Cerro Colorado due to additional work required to re-profile waste dumps for closure and an increase in scope for the closure activities

400 - 450 h Operating costs

Exploration expense (minerals exploration programs)

119 Exploration expense

The Group's adjusted effective tax rate for the full year is expected to be within the guidance range of 30 to 35 per cent

- Taxation expense

Dividends paid to non-controlling interests

1,250 - 1,300 h Financing cash outflow

Gain on sale of BHP's 80 per cent interest in BMC (after tax)

825 - 875 h Exceptional item gain

Net proceedsiv received from the sale of BHP's 80 per cent interest in BMC

~1,250 h Investing cash inflow

Transaction costs related to Unification (after tax)

~430 hExceptional item charge

Financial impact on BHP Brasil of the Samarco dam failure Discontinued operations

Refer footnote v Exceptional item

Gain on merger of BHP's oil and gas portfolio (after tax)

8,000 - 8,300 h Exceptional item gain

Net cash payment to Woodside at completion of the merger and cash left in the BHP Petroleum bank accounts to fund ongoing operationsvi

~1,100 h Investing cash outflow
i

Numbers are not tax effected, unless otherwise noted.

ii

There will be a corresponding balance sheet, cash flow and/or income statement impact as relevant, unless otherwise noted.

iii

Average exchange rates for FY22 of AUD/USD 0.73 (guidance rate AUD/USD 0.78) and USD/CLP 811 (guidance rate USD/CLP 727).

iv

Net of cash remaining in BMC on completion of US$63 million.

v

Financial impact is the subject of ongoing work and is not yet finalised. See corporate update section for further information on Samarco.

vi

As part of completion, BHP made a net cash payment of US$0.7 billion to Woodside. The net payment to Woodside is subject to a customary post-completion review which may result in an adjustment to the amount paid. In addition, US$0.4 billion in cash was left in the BHP Petroleum bank accounts.

Major development projects

In June 2022, we completed the US$2.97 billion Jansen mine shafts project.

At the end of the 2022 financial year, BHP had one major project under development, the US$5.7 billion Jansen Stage 1 project, which is tracking to plan.

BHP Operational Review for the year ended 30 June 2022 3

Average realised prices

The average realised prices achieved for our major commodities are summarised below.

FY22 Jun H22 Jun H22
vs vs vs

Average realised pricesi

Jun H22 Dec H21 FY22 FY21 FY21 Jun H21 Dec H21

Copper (US$/lb)

4.02 4.31 4.16 3.81 9 % (7 %) (7 %)

Iron ore (US$/wmt, FOB)

112.65 113.54 113.10 130.56 (13 %) (29 %) (1 %)

Metallurgical coal (US$/t)

423.82 259.71 347.10 106.64 225 % 269 % 63 %

Hard coking coal (US$/t)ii

437.60 278.60 366.82 112.72 225 % 269 % 57 %

Weak coking coal (US$/t)ii

382.56 218.65 296.51 89.62 231 % 266 % 75 %

Thermal coal (US$/t)iii

302.60 137.68 216.78 58.42 271 % 327 % 120 %

Nickel metal (US$/t)

27,399 19,651 23,275 16,250 43 % 56 % 39 %
i

Based on provisional, unaudited estimates. Prices exclude sales from equity accounted investments, third party product and internal sales, and represent the weighted average of various sales terms (for example: FOB, CIF and CFR), unless otherwise noted. Includes the impact of provisional pricing and finalisation adjustments.

ii

Hard coking coal (HCC) refers generally to those metallurgical coals with a Coke Strength after Reaction (CSR) of 35 and above, which includes coals across the spectrum from Premium Coking to Semi Hard Coking coals, while weak coking coal (WCC) refers generally to those metallurgical coals with a CSR below 35.

iii

Includes thermal coal sales from metallurgical coal mines.

The large majority of iron ore shipments were linked to index pricing for the month of shipment, with price differentials predominantly a reflection of market fundamentals and product quality. Iron ore sales for the June 2022 half year were based on an average moisture rate of 6.9 per cent. The large majority of metallurgical coal and energy coal exports were linked to index pricing for the month of scheduled shipment or priced on the spot market at fixed or index-linked prices, with price differentials reflecting product quality. The majority of copper cathodes sales were linked to index price for quotation periods one month after month of shipment, and three to four months after month of shipment for copper concentrates sales with price differentials applied for location and treatment costs.

At 30 June 2022, the Group had 354 kt of outstanding copper sales that were revalued at a weighted average price of US$3.75 per pound. The final price of these sales will be determined in the 2023 financial year. In addition, 323 kt of copper sales from the 2021 financial year were subject to a finalisation adjustment in the current financial year. The provisional pricing and finalisation adjustments will decrease Underlying EBITDA by US$473 million in the 2022 financial year and are included in the average realised copper price in the above table.

Corporate update

Portfolio

In April 2022, we signed a letter of intent with a consortium led by the Global Maritime forum to assess the development of an iron ore Green Corridor between Australia and East Asia. Green Corridors are specific shipping routes where the economics, infrastructure and logistics of zero or near-zero emission shipping are more feasible and where deployment can be supported by targeted policy and industry action. The new consortium will facilitate a robust public-private dialogue to investigate conditions that need to be in place to mobilise demand and to feasibly scale zero or near-zero- greenhouse gas emission shipping on the corridor.

On 3 May 2022, BHP completed the sale of its 80 per cent interest in BMC to Stanmore Resources Limited. Stanmore Resources paid US$1.1 billion cash consideration at completion plus a preliminary completion adjustment of approximately US$200 million for working capital. US$100 million cash remains payable to BHP on 3 November 2022 with potential for an additional amount of up to US$150 million in a price-linked earnout payable to BHP in the 2024 calendar year. The total cash consideration for the transaction could be up to US$1.35 billion plus the final completion adjustment amount. The Group expects to recognise a net gain on sale of between US$825 million and US$875 million post-tax as an exceptional item in the 2022 financial year.

On 1 June 2022, the merger of BHP's oil and gas portfolio with Woodside was completed. BHP paid a fully franked in specie dividend and distributed Woodside shares to eligible BHP shareholders. The implied value of the in specie dividend was approximately US$19.6 billion or US$3.86 per BHP share. The sale of the Woodside shares of ineligible overseas shareholders and BHP shareholders that elected to participate in the sale facility, was completed and the proceeds have been distributed to participating shareholders. As part of completion, BHP made a net cash payment of approximately US$0.7 billion to Woodside. The net payment to Woodside is subject to a customary post- completion review which may result in an adjustment to the amount paid. The Group expects to recognise a net gain on the merger of between US$8.0 billion and US$8.3 billion post-tax as an exceptional item in the 2022 financial year5.

BHP Operational Review for the year ended 30 June 2022 4

On 16 June 2022, BHP announced that we will retain New South Wales Energy Coal (NSWEC) in our portfolio, seek the relevant approvals to continue mining beyond its current mining consent that expires in 2026 and proceed with a managed process to cease mining at the asset by the end of the 2030 financial year. A trade sale process for NSWEC was conducted however the process did not result in a viable offer. Assessment of the resource economics, geotechnical profile and future investment requirements determined that continued mining in the near term and moving to closure in 2030 provides the optimal financial outcome when compared to alternate options. Continuation of mining to the end of the 2030 financial year will afford eight years to work with our people, state and federal governments and local communities in the Hunter Valley region on a transition approach that supports long-term community sustainability.

Samarco

Samarco's Judicial Reorganisation process is continuing in the Commercial Courts of Belo Horizonte, State of Minas

Gerais. The Judicial Reorganisation is a process for Samarco to restructure its financial debts in order to establish a sustainable independent financial position that would allow Samarco to, among other things, continue its operations safely and meet its Renova Foundation obligations. BHP Brasil will continue to support Samarco in this process. The

Judicial Reorganisation is not expected to affect Samarco's obligation or commitment to make full redress for the 2015 Fundão dam failure, and it does not impact Renova Foundation's ability to undertake remediation and compensation works.

Separately, negotiations are also ongoing with State and Federal Prosecutors and other Brazilian public authorities on the review of the Framework Agreement6, seeking a definitive and substantive settlement of Brazilian claims relating to the dam failure.

On 8 July 2022, the United Kingdom (UK) Court of Appeal decided to allow the group action in the UK against BHP seeking compensation on behalf of individuals, municipalities, private businesses and indigenous peoples in Brazil to continue in the UK. The judgment overturns the earlier decision of the High Court that dismissed the group action. BHP has sought permission to appeal the judgment to the UK Supreme Court. The judgment is not a decision in relation to the merits of the claims made in the group action. It is concerned with the preliminary question of whether the group action can continue against BHP in the United Kingdom.

The impact of this decision and recent legal decisions in Brazil on the Group's Samarco provision is currently being assessed.

We will provide an update to the ongoing potential financial impacts on BHP Brasil of the Samarco dam failure with the release of the financial results on 16 August 2022. Any financial impacts will continue to be treated as an exceptional item.

BHP Operational Review for the year ended 30 June 2022 5

Copper

Production

FY22 Jun Q22 Jun Q22
vs vs vs
FY22 Jun Q22 FY21 Jun Q21 Mar Q22

Copper (kt)

1,573.5 461.8 (4 %) 15 % 25 %

Zinc (t)

123,200 27,576 (15 %) (22 %) (16 %)

Uranium (t)

2,375 776 (27 %) 26 % (1 %)

Copper - Total copper production decreased by four per cent to 1,574 kt. Production for the 2023 financial year is expected to be between 1,635 and 1,825 kt.

Escondida copper production decreased by six per cent to 1,004 kt primarily due to higher than expected concentrator feed grade decline of four per cent, public road blockades affecting access to site for both workers and supplies, and the impact of a reduced operational workforce from COVID-19. Despite these challenges, Escondida achieved record material mined for the 2022 financial year and near record concentrator throughput of 367 ktpd. Production is expected to increase to between 1,080 and 1,180 kt for the 2023 financial year and reflects an expected increase in concentrator feed grade compared to the 2022 financial year. Medium term guidance of 1.2 Mtpa of copper production on average over the next five years remains unchanged, with production expected to be weighted towards the latter years.

Pampa Norte copper production increased by 29 per cent to 281 kt reflecting the ramp up of the Spence Growth Option (SGO), partially offset by the impact of lower cathode production as a result of a 14 per cent decline in Pampa Norte stacking feed grade. Production for the 2023 financial year is expected to be between 240 and 290 kt. This reflects a forecast decline in stacking feed grade at Pampa Norte, the commencement of plant design modifications at SGO and the continued transition towards the planned closure of Cerro Colorado at the end of the 2023 calendar year.

Olympic Dam copper production decreased by 33 per cent to 138 kt as a result of the major smelter maintenance campaign (SCM21), which included COVID-19 impacts on the availability of workforce and was subsequently completed in January 2022. Near record production in the June 2022 quarter followed the successful ramp up of the smelter to full capacity in April 2022. Average copper grade of 2.14 per cent was achieved in the 2022 financial year as the majority of material mined is from the Southern Mine Area. Production for the 2023 financial year is expected to increase to between 195 and 215 kt.

Antamina copper production increased by four per cent to 150 kt, reflecting higher copper head grades. Zinc production decreased by 15 per cent to 123 kt reflecting lower zinc head grades. Copper production of between 120 and 140 kt, and zinc production of between 115 and 135 kt is expected for the 2023 financial year.

BHP Operational Review for the year ended 30 June 2022 6

Iron Ore

Production

FY22 Jun Q22 Jun Q22
vs vs vs
FY22 Jun Q22 FY21 Jun Q21 Mar Q22

Iron ore production (kt)

253,247 64,162 0 % (2 %) 8 %

Iron ore - Total iron ore production was in line with the prior period at 253 Mt. Production for the 2023 financial year is expected to be between 249 and 260 Mt.

WAIO production of 249 Mt (283 Mt on a 100 per cent basis) was in line with the prior period, reflecting continued strong supply chain performance and favourable weather compared to the prior period, offset by the impacts of temporary labour constraints relating to COVID-19, planned track renewal works in the March 2022 quarter and the planned major maintenance on the Jimblebar train load out and car dumper one in the first half. Our preventative maintenance programs continue to underpin the strength of the WAIO supply chain, delivering increased car dumper, reclaimer and ship loader availability year on year and enabling record sales volumes of 284 Mt (100 per cent basis). South Flank ramp up to full production capacity of 80 Mtpa (100 per cent basis) is ahead of schedule with an average rate of 67 Mtpa achieved in the June 2022 quarter contributing to record production from the Mining Area C (MAC) hub and record lump sales.

WAIO production for the 2023 financial year is expected to be between 246 and 256 Mt (278 and 290 Mt on a 100 per cent basis) reflecting the tie-in of the port debottlenecking project (PDP1) and the continued ramp up of South Flank.

Samarco production of 4.1 Mt (BHP share) reflected the ramp up of production to capacity, following the recommencement of iron ore pellet production at one concentrator in December 2020. Production for the 2023 financial year is expected to be between 3 and 4 Mt (BHP share).

Coal

Production

FY22 Jun Q22 Jun Q22
vs vs vs
FY22 Jun Q22 FY21 Jun Q21 Mar Q22

Metallurgical coal (kt)2

29,142 8,183 (9 %) (12 %) 3 %

Energy coal (kt)3

13,701 3,919 (4 %) (13 %) 52 %

Metallurgical coal - BMA production decreased by nine per cent to 29 Mt (58 Mt on a 100 per cent basis). Significant wet weather impacts across most BMA operations and labour constraints, including COVID-19 related absenteeism which impacted stripping and mine productivity, more than offset record production at the Broadmeadow mine. Following the automation of Daunia's truck fleet in November 2021, the automation of Goonyella's pre-strip truck fleet was completed in March 2022 with the Goonyella coal truck fleet expected to be fully autonomous by the end of the December 2022 quarter. Production for the 2023 financial year is expected to be between 29 and 32 Mt (58 and 64 Mt on a 100 per cent basis). A long wall move at Broadmeadow mine is scheduled for the September 2022 quarter.

The divestment of our interest in BMC was completed on 3 May 2022 and BMC volumes are no longer included in metallurgical coal volumes.

Following the announcement of the change to the Queensland royalty regime from 1 July 2022, we will assess the impact on production, jobs and the communities of Central Queensland. At spot metallurgical coal prices7, the effective pre-tax royalty rate has increased by approximately 7 percentage points to 19 per cent. This further cost pressure will discourage investment, operational growth, job creation and local business spending across the state.

The new tax damages Queensland's reputation as a stable place to invest, and will make it harder for the state to compete against other global jurisdictions in attracting major new investments that would deliver longer term value to communities and the state economy.

BHP Operational Review for the year ended 30 June 2022 7

Energy coal - NSWEC production decreased by four per cent to 14 Mt, reflecting lower volumes due to an increased proportion of washed coal to capitalise on higher margins for higher quality coals, COVID-19 related labour constraints which impacted stripping performance and mine productivity, and wet weather. Higher quality coals now make up almost 90 per cent of sales compared to approximately 60 per cent of sales in the prior year. Production for the 2023 financial year is expected to be between 13 and 15 Mt reflecting a continued focus on higher quality coals.

Other

Nickel production

FY22 Jun Q22 Jun Q22
vs vs vs
FY22 Jun Q22 FY21 Jun Q21 Mar Q22

Nickel (kt)

76.8 18.8 (14 %) (16 %) 1 %

Nickel - Nickel West production decreased by 14 per cent to 77 kt due to the significant impacts of COVID-19 related labour absenteeism and workforce shortages, and unplanned downtime at the oxygen plant leading to a 15 day smelter outage in the June 2022 quarter. Production for the 2023 financial year is expected to be between 80 and 90 kt, weighted to the second half of the year due to planned smelter maintenance in the first half.

Potash - Our major potash project under development is tracking to plan.

Projects

Project and
ownership

Capital
expenditure
US$M

Initial
production
target
date

Capacity

Progress

Jansen Potash (Canada)

100%

2,972 CY27 Investment to finish the excavation and lining of the production and service shafts, and to continue the installation of essential surface infrastructure and utilities. 100% complete. This project will not be reported in the projects section of future Operational Reviews.

Jansen Stage 1 (Canada)

100%

5,723 CY27 Design, engineering and construction of an underground potash mine and surface infrastructure, with capacity to produce 4.35 Mtpa. Approved in August 2021, project is 8% complete

Minerals exploration

Total minerals exploration expenditure for 2022 financial year was US$256 million, of which US$199 million was expensed.

Work continues on existing exploration projects, joint ventures and farm-in agreements, as well as leveraging technology to both look deeper in mature exploration jurisdictions and delineate new high potential search spaces globally. Greenfield minerals exploration is being undertaken on advancing copper targets in Chile, Ecuador, Mexico, Peru, Canada, Australia and the south-west United States. Nickel targets are also being advanced in Canada and Australia.

We continued to progress our early stage options in future facing commodities throughout the year. Work continued on the farm-in agreement executed in October 2021 for the early-stage Elliott copper project covering 7,200 km2 in the Northern Territory, Australia, and in April 2022 we agreed to fund a nickel exploration program in Nunavik, Quebec, as part of our strategic alliance with Midland Exploration8.

At Oak Dam in South Australia, BHP is continuing next stage resource definition drilling with six drill rigs.

BHP Operational Review for the year ended 30 June 2022 8

Variance analysis relates to the relative performance of BHP and/or its operations during the 2022 financial year compared with the 2021 financial year, unless otherwise noted. Production volumes, sales volumes and capital and exploration expenditure from subsidiaries are reported on a 100 per cent basis; production and sales volumes from equity accounted investments and other operations are reported on a proportionate consolidation basis. Numbers presented may not add up precisely to the totals provided due to rounding. Copper equivalent production is based on 2022 financial year average realised prices.

The following footnotes apply to this Operational Review:

1

2022 financial year unit cost guidance: Escondida US$1.20-1.40/lb, WAIO US$17.50-18.50/t, Queensland Coal US$85-94/t (which includes BMA of US$88-96/t; divestment of BMC was completed on 3 May 2022), and NSWEC US$76-81/t; based on exchange rates of AUD/USD 0.78 and USD/CLP 727.

2

BHP completed the sale of BMC on 3 May 2022. The transaction has an effective economic date of 3 May 2022 and volumes have been reported separately in the production and sales report.

3

BHP completed the sale of its 33.3 per cent interest in Cerrejón on 11 January 2022. The transaction has an effective economic date of 31 December 2020 and volumes have been reported separately in the production and sales report.

4

Excludes production from Cerrejón (divestment completed 11 January 2022), BMC (divestment completed 3 May 2022) and Petroleum (merger completed 1 June 2022).

5

The net gain on merger will be included as an exceptional item in profit after taxation from discontinued operations in the financial statements.

6

The Framework Agreement was entered into between Samarco, Vale and BHP Brasil and the relevant Brazilian authorities in March 2016 and established the Renova Foundation to develop and implement environmental and socio-economic programs to remediate and provide compensation for damage caused by the Samarco dam failure.

7

PLV FOB spot price of US$243.50/t as at 13 July 2022. Source: Platts.

8

BHP signed an agreement for a nickel exploration alliance with Midland Exploration in August 2020.

The following abbreviations may have been used throughout this report: barrels (bbl); billion cubic feet (bcf); cost and freight (CFR); cost, insurance and freight (CIF); dry metric tonne unit (dmtu); free on board (FOB); grams per tonne (g/t); kilograms per tonne (kg/t); kilometre (km); metre (m); million barrels of oil equivalent (MMboe); million barrels of oil per day (MMbpd); million cubic feet per day (MMcf/d); million tonnes (Mt); million tonnes per annum (Mtpa); ounces (oz); pounds (lb); thousand barrels of oil equivalent (Mboe); thousand barrels of oil equivalent per day (Mboe/d); thousand ounces (koz); thousand standard cubic feet (Mscf); thousand tonnes (kt); thousand tonnes per annum (ktpa); thousand tonnes per day (ktpd); tonnes (t); and wet metric tonnes (wmt).

In this release, the terms 'BHP', the 'Group', 'BHP Group', 'we', 'us', 'our' and ourselves' are used to refer to BHP Group Limited and, except where the context otherwise requires, the respective subsidiaries as defined in note 30 'Subsidiaries' in section 3.1 of BHP's 30 June 2021 Annual Report and Form 20-F. Those terms do not include non-operated assets. Notwithstanding that this release may include production, financial and other information from non-operated assets, non-operated assets are not included in the BHP Group and, as a result, statements regarding our operations, assets and values apply only to our operated assets unless stated otherwise. Our non-operated assets include Antamina and Samarco. BHP Group cautions against undue reliance on any forward-looking statement or guidance in this release, particularly in light of the current economic climate and significant volatility, uncertainty and disruption arising in connection with COVID-19. These forward looking statements are based on information available as at the date of this release and are not guarantees or predictions of future performance and involve known and unknown risks, uncertainties and other factors, many of which are beyond our control and which may cause actual results to differ materially from those expressed in the statements contained in this release.

BHP Operational Review for the year ended 30 June 2022 9

Further information on BHP can be found at: bhp.com

Authorised for lodgement by:

Stefanie Wilkinson

Group Company Secretary

Media Relations Investor Relations
Email: media.relations@bhp.com Email: investor.relations@bhp.com
Australia and Asia Australia and Asia
Gabrielle Notley Dinesh Bishop
Tel: +61 3 9609 3830 Mobile: +61 411 071 715 Mobile: +61 407 033 909
Europe, Middle East and Africa Europe, Middle East and Africa
Neil Burrows James Bell
Tel: +44 20 7802 7484 Mobile: +44 7786 661 683 Tel: +44 20 7802 7144 Mobile: +44 7961 636 432
Americas Americas
Renata Fernandez Sabrina Goulart
Mobile: + 56 9 8229 5357 Mobile: +1 832 781 6698

BHP Group Limited ABN 49 004 028 077

LEI WZE1WSENV6JSZFK0JC28

Registered in Australia

Registered Office: Level 18, 171 Collins Street

Melbourne Victoria 3000 Australia

Tel +61 1300 55 4757 Fax +61 3 9609 3015

BHP Group is headquartered in Australia

Follow us on social media

BHP Operational Review for the year ended 30 June 2022 10
Production summary
Quarter ended Year to date
BHP
interest
Jun
2021
Sep
2021
Dec
2021
Mar
2022
Jun
2022
Jun 2022 Jun 2021

Copper 1

Copper

Payable metal in concentrate (kt)

Escondida 2

57.5 % 195.6 194.7 196.2 178.2 233.5 802.6 871.7

Pampa Norte 3

100.0 % 21.1 26.4 24.2 32.4 28.2 111.2 27.4

Antamina

33.8 % 36.1 35.8 38.4 36.1 39.6 149.9 144.0

Total

252.8 256.9 258.8 246.7 301.3 1,063.7 1,043.1

Cathode (kt)

Escondida 2

57.5 % 51.1 49.0 48.4 48.2 55.8 201.4 196.5

Pampa Norte 3

100 % 48.3 41.1 44.1 35.8 49.0 170.0 190.8

Olympic Dam

100 % 50.8 29.5 14.2 39.0 55.7 138.4 205.3

Total

150.2 119.6 106.7 123.0 160.5 509.8 592.6

Total copper (kt)

403.0 376.5 365.5 369.7 461.8 1,573.5 1,635.7

Lead

Payable metal in concentrate (t)

Antamina

33.8 % 381 378 277 282 181 1,118 2,532

Total

381 378 277 282 181 1,118 2,532

Zinc

Payable metal in concentrate (t)

Antamina

33.8 % 35,483 33,289 29,603 32,732 27,576 123,200 145,089

Total

35,483 33,289 29,603 32,732 27,576 123,200 145,089

Gold

Payable metal in concentrate (troy oz)

Escondida 2

57.5 % 38,893 41,962 42,937 36,303 45,770 166,972 166,968

Pampa Norte 3

100 % 4,728 6,967 5,776 7,929 8,198 28,870 4,728

Olympic Dam (refined gold)

100 % 48,478 26,277 37,805 29,355 26,080 119,517 145,998

Total

92,099 75,206 86,518 73,587 80,048 315,359 317,694

Silver

Payable metal in concentrate (troy koz)

Escondida 2

57.5 % 1,234 1,291 1,462 1,270 1,311 5,334 5,759

Pampa Norte 3

100 % 214 273 215 261 262 1,011 214

Antamina

33.8 % 1,409 1,367 1,308 1,191 1,212 5,078 5,965

Olympic Dam (refined silver)

100 % 185 191 258 149 145 743 810

Total

3,042 3,122 3,243 2,871 2,930 12,166 12,748

Uranium

Payable metal in concentrate (t)

Olympic Dam

100 % 614 531 287 781 776 2,375 3,267

Total

614 531 287 781 776 2,375 3,267

Molybdenum

Payable metal in concentrate (t)

Pampa Norte 3

100 % - - - - 71 71 -

Antamina

33.8 % 111 142 217 190 249 798 863

Total

111 142 217 190 320 869 863
BHP Operational Review for the year ended 30 June 2022 11

Production summary

Quarter ended Year to date
BHP
interest
Jun
2021
Sep
2021
Dec
2021
Mar
2022
Jun
2022
Jun 2022 Jun 2021

Iron Ore

Iron Ore

Production (kt) 4

Newman

85 % 14,560 16,461 14,577 11,940 14,063 57,041 63,221

Area C Joint Venture

85 % 15,920 18,947 22,911 24,888 27,685 94,431 52,386

Yandi Joint Venture

85 % 18,405 11,834 12,261 8,418 6,409 38,922 68,596

Jimblebar 5

85 % 15,337 15,009 15,324 13,444 15,005 58,782 67,393

Samarco

50 % 1,023 1,048 1,029 994 1,000 4,071 1,938

Total

65,245 63,299 66,102 59,684 64,162 253,247 253,534

Coal

Metallurgical coal

Production (kt) 6

BHP Mitsubishi Alliance (BMA)

50 % 9,253 6,715 6,300 7,944 8,183 29,142 31,884

Total

9,253 6,715 6,300 7,944 8,183 29,142 31,884

Production (kt) 6

BHP Mitsui Coal (BMC) 7 8

80 % 2,570 2,135 2,518 2,618 651 7,922 8,741

Total

2,570 2,135 2,518 2,618 651 7,922 8,741

Energy coal

Production (kt)

NSW Energy Coal

100 % 4,492 4,238 2,967 2,577 3,919 13,701 14,326

Total

4,492 4,238 2,967 2,577 3,919 13,701 14,326

Production (kt)

Cerrejón 9

33.3 % 1,784 2,060 2,176 - - 4,236 4,964

Total

1,784 2,060 2,176 - - 4,236 4,964

Other

Nickel

Saleable production (kt)

Nickel West

100 % 22.4 17.8 21.5 18.7 18.8 76.8 89.0

Total

22.4 17.8 21.5 18.7 18.8 76.8 89.0

Cobalt

Saleable production (t)

Nickel West

100 % 241 177 220 125 110 632 988

Total

241 177 220 125 110 632 988

Discontinued operations

Petroleum 10 11

Production

Crude oil, condensate and NGL (Mboe)

12,205 12,751 12,345 11,367 7,057 43,520 46,042

Natural gas (bcf)

88.6 88.4 80.1 75.9 58.8 303.2 340.6

Total (Mboe)

26,972 27,484 25,695 24,017 16,857 94,053 102,809
1

Metal production is reported on the basis of payable metal.

2

Shown on a 100% basis. BHP interest in saleable production is 57.5%.

3

Includes Cerro Colorado and Spence.

4

Iron ore production is reported on a wet tonnes basis.

5

Shown on a 100% basis. BHP interest in saleable production is 85%.

6

Metallurgical coal production is reported on the basis of saleable product. Production figures may include some thermal coal.

7

Shown on a 100% basis. BHP interest in saleable production is 80%.

8

BHP completed the sale of its 80 per cent interest in BHP Mitsui Coal (BMC) on 3 May 2022. Production reported until 30 April 2022.

9

BHP completed the sale of its 33.3 per cent interest in Cerrejón on 11 January 2022. Production reported until 31 December 2021.

10

The merger of BHP's oil and gas portfolio with Woodside was completed on 1 June 2022. Production reported until 31 May 2022.

11

LPG and ethane are reported as natural gas liquids (NGL). Product-specific conversions are made and NGL is reported in barrels of oil equivalent (boe). Total boe conversions are based on 6 bcf of natural gas equals 1,000 Mboe.

Throughout this report figures in italics indicate that this figure has been adjusted since it was previously reported.

BHP Operational Review for the year ended 30 June 2022 12

Production and sales report

Quarter ended Year to date
Jun Sep Dec Mar Jun Jun Jun
2021 2021 2021 2022 2022 2022 2021

Copper

Metals production is payable metal unless otherwise stated.

Escondida, Chile 1

Material mined

(kt) 104,043 113,874 117,284 107,676 115,409 454,243 380,652

Concentrator throughput

(kt) 31,903 33,528 35,787 30,235 34,318 133,868 135,593

Average copper grade -concentrator

(%) 0.77 % 0.73 % 0.71 % 0.80 % 0.88 % 0.78 % 0.81 %

Production ex mill

(kt) 202.8 201.2 203.6 191.5 239.5 835.8 900.6

Production

Payable copper

(kt) 195.6 194.7 196.2 178.2 233.5 802.6 871.7

Copper cathode (EW)

(kt) 51.1 49.0 48.4 48.2 55.8 201.4 196.5

- Oxide leach

(kt) 14.5 14.8 13.1 12.2 17.5 57.6 63.9

- Sulphide leach

(kt) 36.6 34.2 35.3 36.0 38.3 143.8 132.6

Total copper

(kt) 246.7 243.7 244.6 226.4 289.3 1,004.0 1,068.2

Payable gold concentrate

(troy oz) 38,893 41,962 42,937 36,303 45,770 166,972 166,968

Payable silver concentrate

(troy koz) 1,234 1,291 1,462 1,270 1,311 5,334 5,759

Sales

Payable copper

(kt) 194.1 190.5 200.2 177.0 230.4 798.1 872.4

Copper cathode (EW)

(kt) 49.6 46.7 49.7 47.2 58.9 202.5 193.4

Payable gold concentrate

(troy oz) 38,893 41,962 42,937 36,303 45,770 166,972 166,968

Payable silver concentrate

(troy koz) 1,234 1,291 1,462 1,270 1,311 5,334 5,759
1

Shown on a 100% basis. BHP interest in saleable production is 57.5%.

Pampa Norte, Chile

Cerro Colorado

Material mined

(kt) 5,498 5,378 4,782 3,516 3,604 17,280 31,019

Ore stacked

(kt) 3,702 3,566 4,029 3,181 4,259 15,035 14,583

Average copper grade -stacked

(%) 0.58 % 0.60 % 0.62 % 0.53 % 0.55 % 0.58 % 0.60 %

Production

Copper cathode (EW)

(kt) 14.7 13.4 15.3 11.6 14.7 55.0 60.2

Sales

Copper cathode (EW)

(kt) 15.4 12.1 16.0 10.5 16.2 54.8 59.8

Spence

Material mined

(kt) 21,262 21,154 24,025 24,040 26,749 95,968 77,202

Ore stacked

(kt) 4,609 5,258 5,071 5,055 5,099 20,483 20,155

Average copper grade -stacked

(%) 0.72 % 0.64 % 0.66 % 0.67 % 0.66 % 0.66 % 0.81 %

Concentrator throughput

(kt) 4,929 5,786 6,234 6,512 6,311 24,843 8,607

Average copper grade -concentrator

(%) 0.63 % 0.65 % 0.60 % 0.65 % 0.66 % 0.64 % 0.59 %

Production

Payable copper

(kt) 21.1 26.4 24.2 32.4 28.2 111.2 27.4

Copper cathode (EW)

(kt) 33.6 27.7 28.8 24.2 34.3 115.0 130.6

Total copper

(kt) 54.7 54.1 53.0 56.6 62.5 226.2 158.0

Payable gold concentrate

(troy oz) 4,728 6,967 5,776 7,929 8,198 28,870 4,728

Payable silver concentrate

(troy koz) 214 273 215 261 262 1,011 214

Payable molybdenum

(t) - - - - 71 71 -

Sales

Payable copper

(kt) 20.8 28.4 24.9 28.1 28.1 109.5 22.6

Copper cathode (EW)

(kt) 34.1 27.7 31.2 20.2 35.4 114.5 129.8

Payable gold concentrate

(troy oz) 4,728.0 6,967.0 5,776.0 7,929.0 8,198 28,870 4,728

Payable silver concentrate

(troy koz) 214.0 273.0 215.0 261.0 262 1,011 214

Payable molybdenum

(t) - - - - 25 25 -
BHP Operational Review for the year ended 30 June 2022 13

Production and sales report

Quarter ended Year to date
Jun Sep Dec Mar Jun Jun Jun
2021 2021 2021 2022 2022 2022 2021

Copper (continued)

Metals production is payable metal unless otherwise stated.

Antamina, Peru

Material mined (100%)

(kt) 63,393 66,581 58,179 58,118 64,026 246,904 219,642

Concentrator throughput (100%)

(kt) 13,466 13,219 13,011 13,135 13,131 52,496 53,402

Average head grades

- Copper

(%) 0.93 % 0.97 % 1.00 % 0.94 % 1.02 % 0.98 % 0.95 %

- Zinc

(%) 1.24 % 1.16 % 1.11 % 1.13 % 1.05 % 1.11 % 1.25 %

Production

Payable copper

(kt) 36.1 35.8 38.4 36.1 39.6 149.9 144.0

Payable zinc

(t) 35,483 33,289 29,603 32,732 27,576 123,200 145,089

Payable silver

(troy koz) 1,409 1,367 1,308 1,191 1,212 5,078 5,965

Payable lead

(t) 381 378 277 282 181 1,118 2,532

Payable molybdenum

(t) 111 142 217 190 249 798 863

Sales

Payable copper

(kt) 37.3 32.7 41.9 32.9 40.7 148.2 143.5

Payable zinc

(t) 32,044 32,635 32,513 29,920 30,847 125,915 144,063

Payable silver

(troy koz) 1,540 1,103 1,405 1,078 1,230 4,816 5,920

Payable lead

(t) 556 232 344 269 363 1,208 2,938

Payable molybdenum

(t) 268 86 170 199 205 660 1,204

Olympic Dam, Australia

Material mined 1

(kt) 2,143 1,935 1,998 2,424 2,477 8,834 8,704

Ore milled

(kt) 2,429 2,024 1,105 2,122 2,436 7,687 9,487

Average copper grade

(%) 1.95 % 2.03 % 2.17 % 2.21 % 2.15 % 2.14 % 2.00 %

Average uranium grade

(kg/t) 0.56 0.55 0.55 0.62 0.56 0.57 0.57

Production

Copper cathode (ER and EW)

(kt) 50.8 29.5 14.2 39.0 55.7 138.4 205.3

Payable uranium

(t) 614 531 287 781 776 2,375 3,267

Refined gold

(troy oz) 48,478 26,277 37,805 29,355 26,080 119,517 145,998

Refined silver

(troy koz) 185 191 258 149 145 743 810

Sales

Copper cathode (ER and EW)

(kt) 52.7 29.1 17.9 36.3 55.8 139.1 204.4

Payable uranium

(t) 1,179 536 541 236 1,031 2,344 3,816

Refined gold

(troy oz) 47,300 24,654 38,768 30,935 24,622 118,979 143,596

Refined silver

(troy koz) 245 126 290 182 87 685 874
1

Material mined refers to underground ore mined, subsequently hoisted or trucked to surface.

BHP Operational Review for the year ended 30 June 2022 14

Production and sales report

Quarter ended Year to date
Jun Sep Dec Mar Jun Jun Jun
2021 2021 2021 2022 2022 2022 2021

Iron Ore

Iron ore production and sales are reported on a wet tonnes basis.

Western Australia Iron Ore, Australia

Production

Newman

(kt) 14,560 16,461 14,577 11,940 14,063 57,041 63,221

Area C Joint Venture

(kt) 15,920 18,947 22,911 24,888 27,685 94,431 52,386

Yandi Joint Venture

(kt) 18,405 11,834 12,261 8,418 6,409 38,922 68,596

Jimblebar 1

(kt) 15,337 15,009 15,324 13,444 15,005 58,782 67,393

Total production

(kt) 64,222 62,251 65,073 58,690 63,162 249,176 251,596

Total production (100%)

(kt) 72,848 70,587 73,852 66,674 71,660 282,773 284,102

Sales

Lump

(kt) 16,410 17,546 17,827 16,966 20,006 72,345 65,762

Fines

(kt) 48,837 45,039 46,809 42,187 44,308 178,343 186,290

Total

(kt) 65,247 62,585 64,636 59,153 64,314 250,688 252,052

Total sales (100%)

(kt) 73,712 70,815 73,222 67,110 72,796 283,943 283,871
1

Shown on a 100% basis. BHP interest in saleable production is 85%.

Samarco, Brazil

Production

(kt) 1,023 1,048 1,029 994 1,000 4,071 1,938

Sales

(kt) 1,052 1,111 950 943 991 3,995 1,698
BHP Operational Review for the year ended 30 June 2022 15

Production and sales report

Quarter ended Year to date
Jun Sep Dec Mar Jun Jun Jun
2021 2021 2021 2022 2022 2022 2021

Coal

Coal production is reported on the basis of saleable product.

BHP Mitsubishi Alliance (BMA), Australia

Production 1

Blackwater

(kt ) 1,887 1,403 1,202 1,478 1,751 5,834 6,224

Goonyella

(kt ) 2,752 1,798 1,797 2,336 2,429 8,360 9,448

Peak Downs

(kt ) 1,597 1,223 960 1,395 1,366 4,944 5,892

Saraji

(kt ) 1,391 999 1,081 1,366 1,168 4,614 4,489

Daunia

(kt ) 478 377 304 338 472 1,491 1,928

Caval Ridge

(kt ) 1,148 915 956 1,031 997 3,899 3,903

Total production

(kt ) 9,253 6,715 6,300 7,944 8,183 29,142 31,884

Total production (100%)

(kt ) 18,506 13,430 12,600 15,888 16,366 58,284 63,768

Sales

Coking coal

(kt ) 7,801 5,415 4,875 6,334 6,734 23,358 27,271

Weak coking coal

(kt ) 1,069 734 754 805 1,118 3,411 4,020

Thermal coal

(kt ) 400 576 455 484 765 2,280 667

Total sales

(kt ) 9,270 6,725 6,084 7,623 8,617 29,049 31,958

Total sales (100%)

(kt ) 18,540 13,450 12,168 15,246 17,234 58,098 63,916
1

Production figures include some thermal coal.

BHP Mitsui Coal (BMC), Australia 1 2

Production

South Walker Creek

(kt ) 1,500 1,462 1,535 1,530 414 4,941 4,887

Poitrel

(kt ) 1,070 673 983 1,088 237 2,981 3,854

Total BHP Mitsui Coal

(kt ) 2,570 2,135 2,518 2,618 651 7,922 8,741

Sales

Coking coal

(kt ) 535 313 458 576 146 1,493 2,167

Weak coking coal

(kt ) 2,027 1,788 1,812 2,013 667 6,280 6,494

Total BHP Mitsui Coal

(kt ) 2,562 2,101 2,270 2,589 813 7,773 8,661
1

Shown on a 100% basis. BHP interest in saleable production is 80%.

2

BHP completed the sale of its 80 per cent interest in BHP Mitsui Coal (BMC) on 3 May 2022. Production reported until 30 April 2022.

NSW Energy Coal, Australia

Production

(kt ) 4,492 4,238 2,967 2,577 3,919 13,701 14,326

Sales thermal coal - export

(kt ) 4,691 3,780 3,718 2,703 3,923 14,124 14,626

Cerrejón, Colombia 1

Production

(kt ) 1,784 2,060 2,176 - - 4,236 4,964

Sales thermal coal - export

(kt ) 1,619 2,180 2,012 - - 4,192 4,729
1

BHP completed the sale of its 33.3 per cent interest in Cerrejón on 11 January 2022. Production reported until 31 December 2021.

BHP Operational Review for the year ended 30 June 2022 16

Production and sales report

Quarter ended Year to date
Jun Sep Dec Mar Jun Jun Jun
2021 2021 2021 2022 2022 2022 2021

Other

Nickel production is reported on the basis of saleable product

Nickel West, Australia

Mt Keith

Nickel concentrate

(kt ) 50.4 53.7 47.0 47.1 48.0 195.8 224.6

Average nickel grade

( %) 13.3 14.6 13.2 14.4 16.1 14.6 14.4

Leinster

Nickel concentrate

(kt ) 71.4 73.8 77.4 78.0 76.0 305.2 281.9

Average nickel grade

( %) 10.5 8.9 9.1 8.9 10.3 9.3 9.8

Saleable production

Refined nickel 1

(kt ) 17.1 14.4 18.2 13.3 11.7 57.6 70.0

Nickel sulphate 2

(kt ) - - 0.4 0.7 0.5 1.6 -

Intermediates and nickel by-products3

(kt ) 5.3 3.4 2.9 4.7 6.6 17.6 19.0

Total nickel

(kt ) 22.4 17.8 21.5 18.7 18.8 76.8 89.0

Cobalt by-products

(t ) 241 177 220 125 110 632 988

Sales

Refined nickel 1

(kt ) 17.8 13.8 16.9 15.3 11.7 57.7 70.8

Nickel sulphate 2

(kt ) - - 0.1 0.7 0.5 1.3 -

Intermediates and nickel by-products3

(kt ) 4.0 3.9 3.1 2.7 6.4 16.1 17.1

Total nickel

(kt ) 21.8 17.7 20.1 18.7 18.6 75.1 87.9

Cobalt by-products

(t ) 241 177 220 125 110 632 989
1

High quality refined nickel metal, including briquettes and powder.

2

Nickel sulphate crystals produced from nickel powder.

3

Nickel contained in matte and by-product streams.

BHP Operational Review for the year ended 30 June 2022 17

Production and sales report

Quarter ended Year to date
Jun Sep Dec Mar Jun Jun Jun
2021 2021 2021 2022 2022 2022 2021

Discontinued operations

Petroleum 1 2

Bass Strait

Crude oil and condensate

(Mboe) 1,205 1,201 971 895 699 3,766 4,372

NGL

(Mboe) 1,563 1,655 1,140 1,149 1,115 5,059 5,315

Natural gas

(bcf) 32.8 35.8 25.8 22.4 24.1 108.1 113.0

Total petroleum products

(Mboe) 8,235 8,823 6,411 5,777 5,831 26,842 28,520

North West Shelf

Crude oil and condensate

(Mboe) 933 973 1,027 1,016 651 3,667 4,511

NGL

(Mboe) 177 148 180 185 128 641 692

Natural gas

(bcf) 26.5 24.3 25.8 26.4 17.4 93.9 117.6

Total petroleum products

(Mboe) 5,527 5,171 5,507 5,601 3,679 19,958 24,803

Pyrenees

Crude oil and condensate

(Mboe) 690 710 723 684 454 2,571 3,032

Total petroleum products

(Mboe) 690 710 723 684 454 2,571 3,032

Macedon

Crude oil and condensate

(Mboe) - 1 1 - - 2 3

Natural gas

(bcf) 12.6 12.7 12.6 12.5 8.4 46.2 50.3

Total petroleum products

(Mboe) 2,100 2,118 2,101 2,083 1,400 7,702 8,387

Atlantis 3

Crude oil and condensate

(Mboe) 3,117 3,171 3,222 2,692 1,944 11,029 10,513

NGL

(Mboe) 218 222 186 171 119 698 690

Natural gas

(bcf) 1.6 1.7 1.5 1.3 0.9 5.4 5.3

Total petroleum products

(Mboe) 3,602 3,676 3,658 3,080 2,213 12,627 12,086

Mad Dog 3

Crude oil and condensate

(Mboe) 1,099 1,155 1,137 964 659 3,915 4,449

NGL

(Mboe) 77 46 56 35 26 163 220

Natural gas

(bcf) 0.2 0.2 0.1 0.1 0.1 0.5 0.7

Total petroleum products

(Mboe) 1,209 1,234 1,210 1,016 702 4,162 4,785

Shenzi 3

Crude oil and condensate

(Mboe) 2,023 2,016 2,335 2,378 910 7,639 7,510

NGL

(Mboe) 87 102 134 114 41 391 375

Natural gas

(bcf) 0.1 0.4 0.4 0.4 0.1 1.3 1.1

Total petroleum products

(Mboe) 2,127 2,185 2,536 2,559 968 8,248 8,069

Trinidad/Tobago

Crude oil and condensate

(Mboe) 236 491 396 288 257 1,432 573

Natural gas

(bcf) 14.7 13.3 13.9 12.7 7.8 47.7 52.4

Total petroleum products

(Mboe) 2,686 2,708 2,713 2,405 1,557 9,383 9,306

Other Americas 3 4

Crude oil and condensate

(Mboe) 104 83 81 91 54 309 693

NGL

(Mboe) 8 3 - 6 - 9 21

Natural gas

(bcf) 0.1 - - 0.1 - 0.1 0.2

Total petroleum products

(Mboe) 129 86 81 114 54 335 748

Algeria 5

Crude oil and condensate

(Mboe) 668 774 756 699 - 2,229 3,073

Total petroleum products

(Mboe) 668 774 756 699 - 2,229 3,073
BHP Operational Review for the year ended 30 June 2022 18

Production and sales report

Quarter ended Year to date
Jun Sep Dec Mar Jun Jun Jun
2021 2021 2021 2022 2022 2022 2021

Discontinued operations (continued)

Petroleum 1

Total production

Crude oil and condensate

(Mboe) 10,075 10,575 10,649 9,707 5,628 36,559 38,729

NGL

(Mboe) 2,130 2,176 1,696 1,660 1,429 6,961 7,313

Natural gas

(bcf) 88.6 88.4 80.1 75.9 58.8 303.2 340.6

Total

(Mboe) 26,972 27,484 25,695 24,017 16,857 94,053 102,809
1

The merger of BHP's oil and gas portfolio with Woodside was completed on 1 June 2022. Production reported until 31 May 2022.

2

Total boe conversions are based on 6 bcf of natural gas equals 1,000 Mboe. Negative production figures represent finalisation adjustments.

3

Gulf of Mexico volumes are net of royalties.

4

Other Americas includes Neptune, Genesis and Overriding Royalty Interest.

5

The divestment of our interest in the ROD Integrated Development in Algeria was completed in April 2022.

BHP Operational Review for the year ended 30 June 2022 19