Benz Mining Corp. announced the discovery of a third conductive trend, parallel to and 200m in the footwall of the existing Eastmain resource envelope. This trend was confirmed by the last down hole electromagnetic (DHEM) survey of the 2020 field campaign, the results of which have now been interpreted. Third Parallel Conductive Trend identified Second pass processing of fixed loop electromagnetic (FLEM) data in late 2020 identified a conductor in the footwall of the A Zone. The final DHEM survey for the 2020 season probed a deep historical stratigraphic hole drilled well into the footwall of the Eastmain deposit. Strong off-hole conductors confirmed the structural position of the modelled FLEM conductor and the existence of a strongly conductive trend with an EM response comparable with the existing know Eastmain mineralization. The modelled conductor and off hole DHEM have not been previously drilled and the trend seems to continue to the NW of Zone A. The Eastmain Gold Project, situated on the Upper Eastmain Greenstone Belt in Quebec, Canada, currently hosts a NI 43-101 and JORC (2012) compliant resource of 376,000oz at 7.9gpt gold (Indicated: 236,500oz at 8.2gtp gold, Inferred: 139,300oz at 7.5gtp gold). The existing gold mineralization is associated with 15-20% semi-massive to massive pyrrhotite, pyrite and chalcopyrite in highly deformed and altered rocks making it amenable to detection using electromagnetic techniques. Multiple gold occurrences have been identified by previous explorers over a 10km long zone along strike from the Eastmain Mine with very limited but highly encouraging testing outside the existing resource area.