Vestas has secured a 50 MW order with German developer and operator of renewable energy projects, wpd AG, for three projects - Chuangwei 2, Leadway 2 and Hsinyuan wind farms in Taiwan. The Hsinyuan wind farm includes six V136-4.2MW turbines with 112m towers,featuring the largest onshore turbine rotors in Taiwan, which will maximise energy production for the site's medium wind conditions. Chuangwei 2 and Leadway 2 wind farms will be installed with four and two V117-4.2MW turbines with 91.5m towers, respectively. With this order, Vestas' total onshore installed volume in Taiwan will exceed more than 330MW of which more than 110 MW have been done in collaboration with wdp.