VDM Group Limited announced that Phase 2 drilling is now complete at its Cachoeiras do Binga (CdB) Copper Project in Angola (65% owned in VDM). The CdB Project is located 385km south of the Angolan capital city of Luanda; and covers 3,854kms2. It is 32kms from East to West and 129kms from North to South; and shows characteristics of a typical central African sediment-hosted copper deposit. The Phase Two Drilling Program commenced on 6 May 2019 and was recently finished with a total of ninety-three (93) diamond core holes having been drilled for a cumulative total of 5,690.70 metres. In total, combining Phases 1 and 2, the Company has now completed a total of one hundred and thirty-four (134) holes for 9,594 metres.