Tuscany Energy Ltd. announced production results for the month of October 2014. The company reported that the corporate net production for the month of October 2014 averaged approximately 940 BOEd (84% oil). This increase in production was due to the drilling and tie-ins of new Dina horizontal wells at Macklin and Evesham Saskatchewan and increased production from existing wells due to enhanced water disposal capability added in September 2014. Restricted production rates contributed to corporate production averaging approximately 660 BOEd for third quarter of 2014.

The company next plans to drill two horizontal wells in mid-November at its North Macklin property, offsetting a stratigraphic test for the Dina oil zone drilled in September 2014. The test well encountered 9 vertical metres of 33% porous sand in the Dina, with log characteristics identical to presently producing wells in the field. Based on this and subsequent geotechnical work, the company identified 14 new horizontal drill locations on this previously untested portion of its 100% owned Macklin property and will commence drilling the first two horizontal locations mid-November 2014, oriented to the NW and SE of the vertical well.