Titan Minerals Limited announced a summary of historic work completed at the Linderos Project and an outline of planned exploration activity for the next 6 months. Titan has completed a compilation and verification process of historical results for JORC Compliant reporting of previous exploration activity completed at Linderos. By relogging the historical holes Titan has reinterpreted the geological systems at Linderos and has highlighted a much larger system for targeting. Multiple prospects have been identified within the Linderos Project concession package. The advanced stage Copper Ridge Prospect, Meseta Gold Camp and Loma Alta Gold Prospect all have mineralisation evidenced in previous drilling. The early-stage Victoria Prospect highlights a similar footprint of alteration as Copper Ridge and favourable surface geochemistry requires follow-up exploration. The Copper Ridge Prospect is host to an outcropping porphyry, likely part of the prolific Miocene metallogenic belt, which hosts a large proportion of mineralised copper porphyry and epithermal gold system's extending from Peru throughout Ecuador in the Andean Terrane. Linderos Geological Setting: Located in a major flexure of the Andean Terrane, the Linderos Project is situated within a corridor of mineralisation extending from Peru through northern Ecuador that is associated with early to late Miocene aged intrusions. The majority of porphyry copper and epithermal gold deposits in southern Ecuador are associated with magmatism in this age range, with a number of these younger intrusions located along the margin of the extensive Cretaceous aged Tangula Batholith forming a favourable structural and metallogenic corridor for intrusion activity where Titan minerals holds a significant land position in southern Ecuador. Linderos Exploration Plan: The Company has recently commenced an exploration campaign at Linderos comprised of surface geochemistry, with planned heli-borne geophysics, and ground IP geophysical surveys expected to be completed over the next four months. Further details of geophysical survey work will be included in further updates as survey designs are finalised. The exploration activity has commenced on the Linderos project with a focus on advancing Linderos to diamond drilling during the second half of this year. The Copper Ridge and Meseta prospects are the key area of focus in the current exploration campaign, with previous work highlighting the potential for high-grade gold mineralisation near surface ready for immediate drill targeting within the Meseta gold camp. Broad alteration and extensive lower grade gold mineralisation associated with the high-grade gold intercepts at Meseta demonstrate that further drilling of gold targets in the near term will also provide strong support to concurrently assess the scale of potential for the Copper Ridge porphyry target. Longer term exploration plans will be defined as exploration progresses where a tier 1 target could emerge from the associated Cu-Mo system and epithermal gold mineralisation in the telescoping Miocene aged porphyry system. Linderos Project Overview: Located 20km southwest of the Company's Dynasty Gold Project where drilling for resource estimation update is underway, the Linderos Project is comprised of four contiguous concessions totalling over 143km2 located near the Peruvian border in southern Ecuador's Loja Province. Copper Ridge Prospect: Copper Ridge is an advanced stage exploration target featuring outcropping copper and molybdenum anomalism with subsurface mineralisation confirmed in historical reconnaissance drilling. The Cu-Mo mineralised zone mapped in soil geochemistry is centered on dacite porphyry intrusions that are approximately 1km in diameter. The porphyry stock is haloed by a significant footprint of quartz stockworks and porphyry related alteration covering a >3km 2 area. At the northern and eastern margins of the porphyry, sizable argillic to advanced argillic alteration zones associated with extensive gold anomalism overprinted by multiple zones of high-grade epithermal related gold mineralization have been mapped. Historical diamond drilling totals 2,061m drilled in 16 holes on the Copper Ridge prospect that occurred in 3 campaigns between 1974 and 2005 with better results including; 99.75m @ 0.26% copper from 255m drilled depth - ERIKA01; 84.85m @ 0.32% copper (from surface to end of hole) - ERIKA02; 20m @ 0.21% copper from 181m to EOH (open at depth) - ERIKA02A; 77.05m @ 0.19% copper (from surface to end of hole) - DHW05; and 50.25m @ 0.33% copper (from surface to end of hole) - DHW06.