TechnipFMC has been awarded a significant integrated Engineering, Procurement, Construction and Installation (iEPCI™) contract by BP for the Atlantis Phase 3 project. Following final investment decisions from all partners, TechnipFMC will manufacture, deliver and install subsea equipment, including subsea tree systems, manifolds, flowline, umbilicals and subsea tree jumpers, pipeline end terminations, subsea distribution and topside control equipment. This contract also includes provisional services for tooling and personnel required to install the hardware. The Atlantis Phase 3 field is located approximately 150 miles south of New Orleans at a water depth of roughly 2,100 meters (6,800 feet) and will be tied back to the existing platform.