Talisker Resources Ltd. announced assay results from holes SB-2020-020, SB-2020-021 (partial results) and SB-2020-019 (final results) from its resource drill out drill program at the Bralorne Gold Project in British Columbia. As of the end of 2020, Talisker has completed 21,547.95m of drilling at the Bralorne Gold Project, results of which continue to verify and prioritize the interpreted expansion and continuity of targeted vein corridors. A further 4,766 core samples are currently at the laboratory pending release. Today's results are highlighted by the intersection of a broad zone of near-surface gold mineralization in the recently identified Charlotte Zone which returned 22.60 g/t gold over 0.50m within 1.55 g/t gold over 36.95m. Importantly, this zone was intersected at a downhole depth of only 208m (Figure 1, 2, 3). With the validation drill program completed last year, drilling in 2021 is primarily focussed on infill drilling the validated vein corridors; however, the identification of broad zones of gold mineralization close to surface within the Charlotte, Empire and Knight Zones situated above high-grade vein corridors at depth will also continue to be assessed. Highlights include: 22.60 g/t gold over 0.50m, from 226.80m to 227.30m, within 1.55 g/t gold over 36.95m from 208.45m to 245.40m. 5.42 g/t gold over 0.50m, from 79.50m to 80.00m, within 1.00 g/t gold over 7.85m from 78.85m to 86.70m. SB-2020-020 - 6.46 g/t gold over 0.50m, from 80.00m to 80.50m, within 2.17 g/t gold over 2.50m from 80.00m to 82.50m. 8.31 g/t gold over 1.20m, from 748.80m to 750.00m, within 5.07 g/t gold over 2.20m from 748.80m to 751.00m.