Surya Roshni Limited approved investment of INR 400 million for upgradation /modification of Cold Rolling (CR) Plant at Bahadurgarh Plant (Haryana). Location: Bahadurgarh, Distt. Jhajjar, Haryana.

Proposed capacity: addition 35,000 MT per annum. Schedule of Commissioning: By end of July, 2024. Mode of financing: Internal Accruals.

Rationale: The rationale behind the up-gradation/modification of Cold Rolling (CR) Plant to achieve better surface quality and shape of material. It will also meet the closed thickness tolerance for some main segments like stamping, cycle rim and able to add some wider auto stacking stamping as per market requirement. The above up- gradation/modification of the plant will help to reduce the percentage of rejection of the material.

At present, the production capacity of the plant is approx. 1,15,000 MT per annum and after up-gradation/modification, the production capacity will increase to 1,50,000 MT per annum with better surface quality and shape of the material and increase the margins.