Sihayo Gold Limited announced a maiden Inferred Mineral Resource Estimate for Sihorbo South located on the Hutabargot Julu project of the north block of the PT Sorikmas Mining Contract of Work ("CoW"), North Sumatra Province, Republic of Indonesia. This maiden resource estimate is reported in accordance with the 2012 edition of the JORC Code and guidelines for the reporting of exploration results. Highlights: Maiden Inferred Mineral Resource Estimate for the Sihorbo South Prospect: 6.4 million tonnes at 0.5 g/t gold and 17 g/t silver (0.7 g/t gold- equivalent1), containing 100,000 ounces of gold and 3,600,000 ounces of silver (150,000 gold-equivalent ounces) at a 0.3 g/t gold-equivalent cut-off.

Includes 1.0 million tonnes at 1.1 g/t gold and 48 g/t silver (1.8 g/t gold-equivalent), containing 38,000 ounces of gold and 1,600,000 ounces of silver (59,000 gold-equivalent ounces) at a 0.9 g/t gold-equivalent cut-off. Mineralisation extends from surface to 200 m below surface and is open along strike and at depth with Au:Ag ratio increasing to the south. Significant potential remains for additional gold-silver resources in adjacent vein targets located within the 3.5 km x 3 km Hutabargot Julu project area.

Scoping study work is to be conducted on the potential for incorporating Sihorbo South as a satellite operation into the Sihayo Starter Project which is located approximately 6km to the north.