Drilling Report
December 2017
Monthly Drilling Report
Release Date: 10 January 2018
Senex conducted drill stem testing on the Mimas-2 core well as part of appraisal activities on the Western Surat Gas Project in Queensland.
Western Surat Gas Project, Surat Basin, Queensland
The Mimas-2 core well (ATP 795: Senex 100% and operator) reached total depth in early December. Initial results from logs and drill stem tests show net coal and permeability in line with expectations and similar to the quality of the Eos and Glenora blocks. Core samples will undergo further testing ahead of a pilot program planned to be undertaken in this area later in 2018.
Refer to the map in Figure 1 for drilling activity.
DRILLING FOR THE MONTH ENDED 31 DECEMBER 2017
Well details | Working interest *Operator | Status of operations | Horizon targets | |
Western Surat Gas Project Core well Queensland Surat Basin | Mimas-2 ATP 795 | SXY* 100% | Report time: Total depth: Activity: 1124 (AEST) 04/01/2018 533 m Cased and suspended | Walloon Coal Measures |
FURTHER INFORMATION
Investor and Media Enquiries:
Ian Davies | Tess Palmer |
Managing Director | Head of Investor Relations |
Senex Energy Limited | Senex Energy Limited |
Phone: (07) 3335 9000 | Phone: (07) 3335 9719 |
ABOUT SENEX |
Senex is an ASX listed oil and gas exploration and production company focused on generating shareholder value by growing reserves and production. It holds extensive onshore oil and gas acreage in the Cooper and Surat Basins, two of Australia's most prolific onshore energy regions. Senex is well capitalised and has built strong operating credentials over its 30 year history. Senex operates low cost oil producing assets in the Cooper Basin and is progressing a portfolio of gas projects including the Western Surat Gas Project and Project Atlas in Queensland.
Senex Energy Limited | Head Office | Phone +61 7 3335 9000 |
ABN 50 008 942 827 | Level 14, 144 Edward St, Brisbane Qld 4000 | Facsimile +61 7 3335 9999 |
ASX : SXY | GPO Box 2233, Brisbane, Qld, Australia 4001 | Webwww.senexenergy.com.au |
Figure 1: Senex drilling for December 2017: Western Surat Gas Project, Surat Basin, Queensland
Senex Energy Limited | Head Office | Phone +61 7 3335 9000 |
ABN 50 008 942 827 | Level 14, 144 Edward St, Brisbane Qld 4000 | Facsimile +61 7 3335 9999 |
ASX : SXY | GPO Box 2233, Brisbane, Qld, Australia 4001 | Webwww.senexenergy.com.au |
Senex Energy Limited published this content on 10 January 2018 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 09 January 2018 22:29:02 UTC.
Original documenthttps://www.senexenergy.com.au/investor-centre/files/monthly-drilling-report-december-2017/
Public permalinkhttp://www.publicnow.com/view/5DA217247B4C558DAF9504CB1B169F5B5EDE9915