QX Resources Limited announced that it has secured a drill rig to commence a maiden 1,500 metre RC drilling programme in the last week of November 2022 at QXR's 100%-owned Turner River hard rock lithium project, located 15 km south of the Wodgina lithium mine within the Pilbara lithium province, Western Australia. Drilling will target three areas including the high grade lithium area located in and around the recently reported rock chip samples of 1.6% Li2O, 1.1% Li2O and 4.9% Li2O at the Carbonate Hill prospect at Turner River (E45/6042 & E45/6065). This prospect covers an area 350 metres x 200 metres which now extends under cover.

A Programme of Works (PoW) has been submitted and approved for the drill programme with Topdrill to undertake the works. Two other areas will also be drill tested at Turner River. Further surface sampling is about to commence together with a detailed geophysical survey which is being planned.

Technical consultants, Resource Potentials have been engaged, led by Dr Jason Myers who has significant experience in the Pilbara lithium region to undertake a comprehensive geophysical database review and oversee the upcoming drill program.