Premier African Minerals Limited reported initial complete hole assay results from the recently completed 2,500 metre drilling programme at the company's Zulu Lithium and Tantalum Project (Zulu). Highlights: Final analysis received from drill-hole Zulu 1A confirms significant lithium grade at up to 2.33% Li2O and lithium mineralization from 214 meters to 238 metres down hole, including 8 metres at 1.85% from 230 metres. Drill-hole ZDD 10 returned lithium mineralization from 78 metres to 121 metres with grades up to 2.35%, including 10 metres at 1.56% Li2O from 111 meters. Final lithium results are still outstanding from 8 holes from the recent drill programme. Final Tantalum results are awaited for tantalum on all holes.