Petromin Resources Ltd. announced that it has completed construction of the battery facility at the Company's Morningside discovery well (15-23-42-28W4M). The well has now been placed on production with all equipment being powered by casing head gas. Rates of production will be announced when stabilized.

Water cut is minimal. Based on the response, additional offset wells are being proposed, and can now be directionally drilled from the current surface lease containing gas pipeline and battery facility. Morningside is a multi-zone prospect with additional targets in the Basal Quarts (Ellerslie) formation and bypassed gas targets in the Glauconitic, Ostracod, Belly River and coalbed Methane (CBM) formations.