Oriri Rail Infrastructure Limited has secured orders worth INR 127,986,280.91 from Integral Coach Factory (ICF), Chennai, Indian Railways' and the details for the same are mentioned: significant terms and conditions of order(s)/contract(s) awarded in brief: Delivery is to be made to ICF: Furnishing Depot. Further, 90 % of payment to be received against Inspection Certificate issued by the nominated inspection agency as specified in the contract and proof of dispatch/delivery of the material and Balance 10 % after receipt, inspection and acceptance of the goods. nature of order(s) /contract(s): Manufacturing and Supplying of 208 sets of Seat and Berths for LWACCN coaches.
Market Closed -
Other stock markets
|
5-day change | 1st Jan Change | ||
258.6 INR | +1.67% | -9.31% | +11.61% |
02-26 | Oriental Rail Infrastructure to Supply 208 Seats, Berths to Indian Railways | MT |
02-24 | Oriental Rail Infrastructure Limited Secures Orders from Integral Coach Factory | CI |
1st Jan change | Capi. | |
---|---|---|
+11.61% | 190M | |
+32.66% | 29.69B | |
+36.31% | 26.75B | |
-3.40% | 3.23B | |
+41.35% | 3B | |
+17.49% | 2.56B | |
+20.46% | 1.66B | |
+3.83% | 1.25B | |
+9.34% | 759M | |
+0.46% | 585M |
- Stock Market
- Equities
- ORVENPR Stock
- News Oriental Rail Infrastructure Limited
- Oriental Rail Infrastructure Limited Secures Orders from Integral Coach Factory