The mineralization in the
'This brings to six the number of drill holes for which analytical results have been obtained to date from the sampling program. As the number of drill holes with 100+m intersections of
Sampling of diamond drill core from holes NP0804 and NP0805 has produced continuous mineralized intersections of 123.2m (NP0804: 1.8-125m) and 125.7m (NP0805: 5.3-131m) of niobium (Nb), tantalum (Ta), phosphate (P2O5), and rare earth elements (REE) including lanthanum (La), cerium (Ce), samarium (Sm), neodymium (Nd) and yttrium (Y) - analytical results are tabulated below. Eighteen drill-holes have been sampled to date, focussing on drill-holes collared to intercept the Southwest (SW) Area this domain measures 1km in length and is between 150m and 750m wide at surface. The sampling will provide information to support the Company's goal of establishing a mineral resource at
All samples were analysed by
About
Forward-Looking Statements
This news release contains certain 'forward-looking statements.' All statements, other than statements of historic fact, that address activities, events or developments that Nuinsco believes, expects or anticipates will or may occur in the future are forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as 'seek,' 'anticipate,' 'believe,' 'plan,' 'estimate, 'expect,' and 'intend' and statements that an event or result 'may,' 'will,' 'can,' 'should,' 'could,' or 'might' occur or be achieved and other similar expressions. These forward-looking statements reflect the current expectations or beliefs of Nuinsco based on information currently available to Nuinsco. Forward-looking statements are subject to a number of risks and uncertainties that may cause the actual results of Nuinsco to differ materially from those discussed in the forward-looking statements, and even if such actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on Nuinsco. Factors that could cause actual results or events to differ materially from current expectations include, among other things, failure to successfully complete financings, capital and other costs varying significantly from estimates, production rates varying from estimates, changes in world copper and/or gold markets, changes in equity markets, uncertainties relating to the availability and costs of financing needed in the future, equipment failure, unexpected geological conditions, imprecision in resource estimates, success of future development initiatives, competition, operating performance of facilities, environmental and safety risks, delays in obtaining or failure to obtain tenure to properties and/or necessary permits and approvals, and other development and operating risks. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, Nuinsco disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Although Nuinsco believes that the assumptions inherent in the forward-looking statements are reasonable, forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.
Contact:
Email: paul.jones@nuinsco.ca
(C) 2021 Electronic News Publishing, source