Minera IRL Limited announced production results for the month November 2022 and for the period between January and November 2022. The company announced that the Corihuarmi Gold Mine (“Corihuarmi”) has shipped 2,123 ounces of gold in November 2022, an increase of 395 ounces over the 1,728 ounces shipped in October 2022 and 933 ounces more than the 1,190 ounces shipped in September 2022.

Mineralized material mined and placed on the leach pads between January and November 2022 totaled 4,117,650 tonnes at an average grade of 0.216 grams per tonne, containing 28,654 ounces of gold. As at the end of November 2022, a total of 19,373 ounces of gold have been shipped.