New Energy Solar announced that the Beryl Solar Farm project entity (Project) has executed a variation under its engineering, procurement and construction contract with Downer Utilities Australia Pty Limited, under which the modules installed will change to modules produced by LONGi Green Energy Technology Co. Ltd. (LONGi) leading to an expected performance improvement and increase in project value. The use of LONGi modules has allowed for a redesign that will increase the number of modules and thereby increase project installed capacity by 2.5 MW DC from 108.4 MW DC to 110.9 MW DC, with a resulting increase in expected annual generation and annual cash yields.