Legacy Iron Ore Limited (Legacy Iron) is pleased to announce that drilling has commenced at the Kangaroo Bore and Blue Peter deposits as part of the first phase of metallurgical test work.

A total of 6 to 7 PQ size (83 -85 mm core) holes will be drilled. The planned drill depth ranges from 75 m to 140 m.

The recovered core will be used in first pass metallurgical test work as an important next step in determining the economic viability of the Mt Celia project.

Contact:

Rakesh Gupta

Tel: +61 8 9421 2000

(C) 2020 Electronic News Publishing, source ENP Newswire