A total of 6 to 7 PQ size (83 -85 mm core) holes will be drilled. The planned drill depth ranges from 75 m to 140 m.
The recovered core will be used in first pass metallurgical test work as an important next step in determining the economic viability of the Mt Celia project.
Contact:
Tel: +61 8 9421 2000
(C) 2020 Electronic News Publishing, source