JNS Holdings Corporation announced that JNS Power & Control Systems Inc. has been awarded a contract for the temperature control system installation as part of the Hilton Hotel renovations. The renovations are being performed on the Conrad suite, public restrooms, fourth floor meeting rooms and the lobby at the 1,544 room Hotel.