GoldON Resources Ltd. announced that it has mobilized a crew from Emerald Geological Services for fieldwork to prepare for the next phase of drilling at its 100%-owned West Madsen gold property (the Property"). Located in the heart of the Red Lake Gold Camp, the 5,988-hectare Property shares its eastern boundary with West Red Lake Gold's Madsen mine/mill property. In addition to prospecting, the fieldwork will include detailed geological mapping to test structural features interpreted from the airborne geophysical survey Great Bear Resources had flown on the Property in 2017.

The area of focus (Figure 2) is immediately adjacent to GoldON drill hole WM- 21-22, which intersected a broadly mineralized granodiorite unit in the 2021 drill program that returned 194.9 metres of 0.158 grams per tonne gold from 72 metres down hole. Detailed geological mapping of the target area in advance of drilling will aid with: (1) determining the best drilling orientation (location, angle, and length) to test the plunge and lateral extent of the known mineralization; and (2) scouting all potential drill collar locations for their suitability regarding access and maneuvering with the drill rig.