GE Power India Limited has received a purchase order from NTPC Limited for Supply of Main Turbine Spares at NTPC Talcher. Time period by which the order(s)/contract(s) is to be executed 9.5 Months. Base value of contract as INR 18.71 million (plus 18% GST).