Sudbury - Frontier Lithium Inc. (TSX.V: FL) (the 'Company) is pleased to announce the remaining results of their second Phase of drilling on the Spark Pegmatite.

Frontier completed four diamond drill holes totaling 1,159.5 m in July-August 2019. During the drill program an additional 4 channels totaling 52 m were cut and most of the exposed outcrop surface in the immediate area of the pegmatite was mapped. An analysis of the results from the drill program and assay results from the first two drill holes are included in a Press Release dated September 24th, 2019 and will not be repeated in this Press Release.

About Frontier Lithium Inc.

Frontier Lithium is a Canadian junior mining company with the largest land position in the Electric Avenue, an emerging premium lithium mineral district located in the Canadian Shield of northwestern Ontario. The company's PAK Lithium Deposit contains North America's highest concentration of rare low-iron spodumene. Frontier Lithium's objective is to firstly become a near term producer of premium technical grade lithium mineral concentrates of 2,000 tonnes of Lithium Carbonate Equivalent ('LCE') for glass producers. Through a phased approach to scale up to 20,000 tonnes by ramping up production of concentrates and building a downstream processing facility to produce lithium chemicals required by glass and battery materials producers.

Frontier maintains a tight share structure with management ownership exceeding 30% of the Company.

About the PAK Lithium Project

The PAK Deposit is located in the south end of Ontario's Electric Avenue, a newly emerging premium lithium-metal district. Electric Avenue also hosts Frontier's newest discovery, Spark showing (2km northwest) and the Pennock Lake pegmatite occurrence a further 30km along Frontier's PAK Lithium Project. The PAK deposit has a mineral resource estimate of 9.3 Mt averaging 2.04% Li2O which has a rare technical/ceramic grade spodumene with low inherent iron (below 0.1% Fe2O3) as per its NI 43-101 Technical Report, 'Preliminary Feasibility Study' disseminated on April 16, 2018.

Contact:

Bora Ugurgel

Tel: +001 705.897.7622

Fax: +001 705.897.7618

(C) 2020 Electronic News Publishing, source ENP Newswire