Fluor Corporation announced that its joint venture team was awarded an engineering, procurement and construction contract for BHP's Spence Growth Option project at the Spence open-cut copper mine in northern Chile. The 50/50 joint venture with SalfaCorp is responsible for the delivery of the 95,000-ton-per-day copper concentrator and associated works. Fluor will book its share of the value in the third quarter of 2017.
Real-time Estimate
Other stock markets
|
5-day change | 1st Jan Change | ||
43.43 USD | -0.28% |
|
-3.15% | +10.65% |
![Consensus](/images/consensus_flch.gif)
EPS Revisions
1st Jan change | Capi. | |
---|---|---|
+10.65% | 7.46B | |
-11.26% | 60.37B | |
+0.02% | 58.53B | |
+15.17% | 37.2B | |
+13.10% | 30.41B | |
+10.42% | 28.4B | |
+15.67% | 20.75B | |
+14.69% | 19.41B | |
+33.62% | 17.22B | |
+67.31% | 17.16B |
- Stock Market
- Equities
- FLR Stock
- News Fluor Corporation
- Fluor Corporation Joint Venture with SalfaCorp Receives BHP Copper Concentrator Mining Project in Chile