European Lithium Limited announced to advise it is on schedule to achieve another key milestone of the definitive feasibility study (DFS) at the Company's advanced Wolfsberg Lithium Project (Wolfsberg Project), in Austria. Dorfner/Anzaplan (Dorfner) appointed for the complex metallurgical test-work, that is part of EUR's DFS, received samples from the Company's -70 mm bulk sample stockpiles. Dorfner has advised the Company of the progress of the metallurgical test-work, confirming it will be completed with DRA Global supervising, on budget as scheduled. European Lithium is in the process of developing the Wolfsberg Project and aims to become the first local lithium supplier into an integrated European battery supply chain. These final tests are an integral part of risk mitigation to ensure a consistent, high quality battery-grade Lithium hydroxide (LiOH) final product. European Lithium is ideally placed to have an advanced stage project scheduled to commence operation in 2023, central to most major European EV automakers. With a favourable mining environment and existing mining permit, European Lithium will be well placed to meet the EV battery demand for high grade lithium. The Company also plans to make use of the projects by-products, quartz and feldspar, supplying the European glass and ceramics industry. The Company will also apply an appropriate Q&A process for consistency and sustainability of these products.