DMR Hydroengineering & Infrastructures Limited has received a work order on February 07, 2024 for Detailed Design and Engineering Services of 14.50 MW Pareng Hydropower Project located in Arunachal Pradesh. Whether domestic or international; Domestic entity. Nature of order(s) /contract(s); Engineering Consultancy Services. Time period is 36 months. Broad consideration or size of the order(s)/contract(s): INR 148 Million plus applicable taxes
only.