BIRIMA GOLD RESOURCES CONSULTING

S09/Hann Mariste II - Dakar Senegal

N.I.N.E.A 007 054 521 - Register No SN DKR 2018 A 27289

Tel +221 77 722 2295, Dakar, Senegal. +226 625 87 3748, Conakry, Guinea

Email.cordiordieng@hotmail.com/ birimagoldresources@gmail.com

INDEPENDENT TECHNICAL REPORT FOR THE GARALO GOLD PERMIT

Sikasso Region -Mali South - West Africa

PREPARED FOR

CONTANGO HOLDINGS PLC

Brandon Hill Capital Limited

Jonathan Evans

T: +44 (0)20 3463 5016

E:jonathan.evans@brandonhillcapital.com

by

BIRIMA GOLD RESOURCES CONSULTING

Report for NI 43-101

Qualified Person:

Serigne DIENG Ph.D. AuSIMM

Effective Date: 12th March, 2021

TABLE OF CONTENTS

Page

1.

SUMMARY

10

1.1.

EXECUTIVE SUMMARY

10

1.2.

CONCLUSIONS

11

1.3.

RECOMMENDATIONS

13

1.3.1.

DRILLING

13

1.3.1.1.

Garalo G1 Target

13

1.3.1.1.1.

Recommended Phase I RC Drilling Program

13

1.3.1.1.2.

Recommended Phase II DD Drilling Program on G1 Target

13

1.3.1.2.

Garalo G3 Target

14

1.3.1.2.1.

Recommended Phase I RC Drilling Program on G3 Target

14

1.3.1.2.2.

Recommended Phase II DD Drilling Program on G3 Target

14

1.3.1.3.

Phase III RAB drilling program on others targets within the Garalo permit

15

1.3.2.

Geophysical Survey

16

1.3.3.

Additional Recommendations

16

1.3.4.

Recommended Exploration Budget

17

1.4.

TECHNICAL SUMMARY

18

1.4.1.

Property Location

18

1.4.2.

Property Description and Land Tenure

18

1.4.3.

Regional Geology

19

1.4.4.

Property Geology

20

1.4.4.1.

The metasedimentary sequence

20

1.4.4.2.

The granitic intrusive rocks

20

1.4.4.3.

Late syn-tectonic to post tectonic intrusive rocks

20

1.4.5.

Structures

22

1.4.6.

Mineralization

22

1.4.7.

Exploration

23

2.

INTRODUCTION

26

2.1

Preparation

26

2.2

Purpose of the Report

26

2.3

Source of Information and Data

26

2.4.

Forward Looking Information

27

3.

RELIANCE UPON OTHER EXPERTS

28

4.

PROPRIETY DESCRIPTION AND LOCATION

29

4.1

Location

29

4.2

Property Description Ownership, Obligations. Government Participation, Royalties Encumbrances

30

4.3

Exploration Permit

31

4.4

Environmental Liabilities

32

5.

ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURES AND

PHYSIOGRAPHY

33

5.1

Accessibility

33

5.2

Climate

33

5.3

Local Resources

34

5.4

Infrastructure

35

5.5.

Community

35

5.6.

Physiography

35

6.

HISTORY

36

6.1.

History of the gold exploration in Mali

36

7.

GEOLOGICAL SETTING AND MINERALISATION

39

7.1.

Regional Geological and Structural Setting

39

7.1.1.

Geology of the Birimian of the West Africa Shield

41

7.1.1.1.

Leo-Man Shield

41

7.1.1.2.

Baoulé-Mossi Domain

41

7.1.2.

Geology of Mali

43

7.2.

Permit Geological and Structural Setting

43

7.2.1.

Geological setting

44

7.2.1.1.

The metasedimentary sequence

45

7.2.1.2.

The granitic intrusive rocks

45

7.2.1.3.

The volcanic basaltic rock

45

7.2.1.4.

Late intrusive rocks

46

7.2.1.4.1.

The Gabbro dykes

46

7.2.1.4.2.

The diorite dykes

46

7.2.1.4.3.

Leucocratic felsic intrusive

47

7.2.2.

Structural Setting

48

7.2.3.

Gold Mineralization

49

7.2.4.

Alteration

51

8.

DEPOSIT TYPES

53

9.

EXPLORATION

54

9.1.

Soil Sampling Geochemistry Survey

54

9.1.1.

Soil geochemical sampling completed by AGEX in 2001 within the Garalo permit

54

9.1.2.

Soil geochemical sampling completed by PGRM in 2004 within the Garalo permit

55

9.1.3.

Soil geochemical sampling completed by GSM in 2005 within the Garalo permit

56

9.2.

Regolith Mapping

57

9.3.

Geophysical Survey

59

9.3.1.

Regional Airborne Magnetic & Radiometric Survey

59

9.3.2.

Ground Geophysical Survey

61

9.3.2.1.

Induced Polarization Specification

61

9.3.2.2.

Processing of Induced Polarization Results

61

9.3.2.3.

Ground Induced Polarization Geophysical Survey on Target G1A

61

9.3.2.4.

Ground Induced Polarization Geophysical Survey on Target G3A

65

9.3.2.5.

Conclusions and Recommendations

68

9.4.

Trenching Program

68

9.4.1.

Trenching Program completed by AGEX on Target G3A in 2003

68

9.5.

Drilling Program

69

9.5.1.

RAB Drilling program completed by AGEX in 2003

69

9.5.2.

RC Drilling program completed by AGEX in 2003

70

9.5.2.1.

RC Drilling program completed by AGEX on Target G1A in 2003

71

9.5.2.2.

RC Drilling program completed by AGEX on Target G3A in 2003

72

9.5.3.

RC Drilling program completed by AGEX in 2004

75

9.5.4.

RAB Drilling program completed by AGEX in 2004

76

Page 3 sur 151

9.5.5.

Diamond Drilling program completed by GSM in 2006

77

9.5.5.1.

Diamond Drilling program completed by GSM on G3A Target in 2006

79

9.5.5.2.

Diamond Drilling program completed by GSM on G1A Target in 2006

83

9.5.6.

AC Drilling program completed by GSM in 2008

87

9.5.6.1.

Grid G6 - Air-Core Drill Program

87

9.5.6.2.

Grid G1B - Air-Core Drill Program

93

9.5.7.

RC Drilling program completed by GSM in 2008

96

9.5.7.1.

RC Drilling program completed by GSM in 2008 on G1A Target

97

9.5.7.2.

RC Drilling program completed by GSM in 2008 on G3A Target

100

10.

DRILLING

105

10.1.

Diamond Drilling program completed by GSM

105

10.2.

Reverse Circulation (RC) Drilling

105

10.3.

GSM Air Core Drilling

105

10.4.

Drilling Quality

106

10.5.

RC and Air Core drill hole logging

106

10.6.

Logging Quality

106

11.

SAMPLING METHOD AND APPROACH

107

11.1.

Diamond Core Sampling

107

11.2.

RC Sampling

107

11.3.

RAB and Aire Core Sampling

107

11.4.

Analytical Laboratories

107

12.

SAMPLE PREPARATION ANALYSIS AND SECURITIES

108

12.1.

RC and Auger samples

108

12.2.

RC and Aire Core Drill Samples analysis

108

12.3.

QA/QC Procedures

108

12.4.

QA/QC Program Quality Control Procedures

108

13.

DATA VERIFICATION

109

14.

MINERAL PROCESSING ET METALLURGICAL TESTING

110

15.

MINERAL RESOURCE ESTIMATES

110

16.

MINERAL RESERVE ESTIMATES

110

17.

MIMING METHOD

110

18.

RECOVERY METHOD

110

19.

PROJECT INFRASTRUCTURE

110

20.

MARKET STUDIES ET CONTRACTS

110

21.

ENVIRONMENTAL STUDIES, PERMITTING AND SOCIAL OR COMMUNITY IMPACTS

110

22.

CAPITAL AND OPERATING COST

110

23.

ECONOMIC ANALYSIS

110

24.

ADJACENT PROPRITIES

111

24.1.

Kalana Gold Deposit

111

24.2.

Yanfolila Belt

113

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original document
  • Permalink

Disclaimer

Contango Holdings plc published this content on 18 March 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 18 March 2021 09:17:08 UTC.