Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output - 1084 MWe
  • Electricity production since the beginning of the year: 156 598 MWh

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output - 1102 MWe
  • Electricity production since the beginning of the year: 158 607 MWh

Attachments

  • Original document
  • Permalink

Disclaimer

CEZ a.s. published this content on 07 January 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 07 January 2021 09:21:05 UTC